Laserfiche WebLink
MUM <br /> s <br /> 2. After the materials have -been determined to detailed <br /> o be non- <br /> hazardous, it will be necessary <br /> to plan for the proposed reuse of the materials. This plan <br /> should include: <br /> a. a_. evaluation of the quantity of soil to be treated; <br /> b. an analysis of the levels of hydrocarbons present in <br /> the soil; <br /> c. the proposed mixing and placement methods; <br /> d. identification of the location(s) where the pavement <br /> will be placed; <br /> e. a proposed time schedule for the project; <br /> f. date for submittal of the report of project <br /> completion. <br /> 3. The destruction of on-site monitoring wells. <br /> 4. A submittal of the report indicating project completion. <br /> If you have any questions, contact Darlene Reuss, RENS, of my <br /> staff, at (209) 468-3441. <br /> Jogi Khanna, M.D. , M.P.H. <br /> Health O c <br /> rie AC ul a,l REHS, Program Manager <br /> A. ot <br /> rivironmental Health Division <br /> LAC/RDR:nr <br /> c: CRWQCB - G. L. Boggs/Tom Peltier <br /> 3443 Routier Rd. , Sacramento, CA 94244 <br /> V-'c: William J. ounter Stpssoc atacrameennisCAllen <br /> 2701 Cottage Way, <br /> 95825 <br /> C, City of Lodi CA 95240 <br /> 211 W. Pine St, Lodi, <br /> c: DHS-Alt Tech <br /> ,,• � � 199D <br /> RECEIVED <br />