My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012639
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
ARCHIVED REPORTS_XR0012639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:02:04 AM
Creation date
6/9/2020 9:49:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012639
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f 3; <br /> e*cavat ion and that the SJLHD be r.ot i f ied in t irnc to Zvi mess a I 1 <br /> sampling. <br /> Af ter Nva i t ing tint i ! February , 1989 , cxcavat ion was carrrnenced <br /> without DHS approvai , althoul;h thev were notified that such <br /> activities were going to CtSrrtnen(_e. The i�e.c. 9 , 1955 proposal was <br /> never approved by the DHS, pres;:mcabIV owing to the fact that " 1e <br /> have found the plan inadequafeer.rifir-aIIv addressuorfl� definec, tIle <br /> as ttie work plan does not - p <br /> lateral and vertical extent of soi ! and/or groundwater contamina- <br /> tion. " , <br /> quotcd from Appendix A- ! 1 , %lay, 1959. It would seem that <br /> a proposed additional 5 , 335 cu. ft . of sail removal at the site <br /> of contamination, which encompassed an area from the surface to <br /> the groundwater vertically and horizontally to surrounding moni - <br /> toring wells , which had tested clean, could be presumed to remove <br /> all contarninated material , not just define extent . However , the <br /> proposal did not include the use of either a registerd geologist <br /> or engineer as is required by County and Tri-Regional guidelines . <br /> Based on the above premise, that all contaminated soil could be <br /> removed, the DHS was informed that owing to many considerations , <br /> including safety, protection of the groundwater from <br /> on <br /> through the open pit that still had contaminated soil in it and <br /> time considerations , JTO was going ahead with excavation. During <br /> February, 1959 the pit was dug to its approximate size today, <br /> about 160 ' to 150' across at the outer perimeter and 4 1 delep;4 ) t <br /> was later refilled to about 30 ' , its current depth <br /> Access ramps and erosion gulleys extend farther OUT. <br /> eoriginal <br /> dug depth of about 45' below ground level (9- 1 . ) , put <br /> bottom <br /> of the pit well into the ground water table, which had been found <br /> t at about -3S to -40 ft g. l . by GTI . (Apendix A-7) . During exca- <br /> vation, he sides were cut with lifts ( terraces) to help prevent <br /> caving of the sidewalls , leaving the bottom of the pit about 10' <br /> to 60' smaller than the top periphery. The total spoil removed <br /> now totaled about 15,000 cu. yds. %li clean spoil '-Vas placed on <br /> plastic sheeting over asphalt in file # 3 , contaminated spoil was <br /> placed either in Pile ,1 1 or Pile # 2 , also over plastic sheeting <br /> lying either on asphalt paving or concrete slabs . Segregation was <br /> achieved by a combination of visual inspect-i-on and odor . JTO re- <br /> ported that water did not immediately ediaely enter the hale when digging <br /> below the -39' groundwater level . A ckayey sand was penetrated at <br /> about -40g. l . , at the south end o{'the excavation and ground- <br /> water entered the hole thereafter . This clayey sand was logged in <br /> The GTI boring ,f 5 . Water gradually filled the excavation to a <br /> 10' seep at the south end of the excavation <br /> depth of about - 35' , <br /> (See Appendix 14 map) . The level of the water was measured by a <br /> surveyor and JTO from the top of the asphalt surface at the top <br /> of the entrance ramp, about 50' above mean sea level . This would <br /> put the standing water level about 5 ' higher than either County <br /> !eve_1 s mea s u r ed in t h e <br /> ---- - Control-records - {Fi 5 _, or- _ <br /> -F3 ood 5•-- _ - - - - <br /> monitoring wells . The -35' g • 1 . elevation was taken in Aper,,_ <br /> 1959, at a time when there had not been any recent rainfall . The <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.