Laserfiche WebLink
- � 1 <br /> The data obtained from the chemical analyses will be evaluated to estimate the lateral and vertical <br /> extent of soil contamination from petroleum hydrocarbons, and to evaluate the impact of the releases on <br /> groundwater quality. <br /> Report <br /> f A report summarizing the data obtained from the investigation including conclusions and <br /> recommendations willl, a prepared. The report will identify areas where remediation may be required <br /> and will present estimates of the areal extent(lateral and vertical)of soil and groundwater that has been <br /> impacted, if applicable. <br /> PROJECT SCHEDULE <br /> fieldwork within 10 days. The <br /> e ronin the e <br /> ATC anticipates b Y <br /> IE Following approval of the Workplan, p . g g <br /> fieldwork is estimated!to be completed in two days. A final report will be prepared within three weeks <br /> of receiving the certified analytical reports. <br /> If you have any questions, please call David Oliver at(530) $78-6001. <br /> Sincerely, <br /> ATC Associates, Inc.. <br /> David W. Oliver James A. Lehrman,RG, CH <br /> v <br /> Project Geologist 'Senior Project Manager <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Vicinity Map <br /> Figure 3 - Site Detail Map <br /> Soil Boling Permit Application <br /> Copies: Mr. Bob Oliver, AT&T <br /> 1 <br /> f <br /> f <br /> k ATC Associates Inc. " 4 75.61059.0029 <br />