My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007378 CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
3500 - Local Oversight Program
>
PR0545765
>
ARCHIVED REPORTS_XR0007378 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:18:14 AM
Creation date
6/9/2020 10:14:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007378 CASE 2
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK REMOVAL <br /> AT&T <br /> MICROWAVE RELAY FACILITY <br /> LODI,CALIFORNIA <br /> UST contents in order to solidify them and removed the contents from the UST with an excavator <br /> These contents totaled approximately SO cubic yards were placed In three stockpiles designated SP1, <br /> SP2, and SP3 The UST was not rinsed by Kvaerner prior to Its removal <br /> 43 UST and Piping Removal Procedures <br /> Kvaerner commenced soil excavation on January 27, 1999 An excavator was used to remove <br /> approximately 230 tons of soil from above and around the UST Soil was placed on visqueen on the <br /> ground to the east of the UST and was designated soil stockpiles SP4, SPS, SP6, and SP7 Product <br /> piping was disassembled and removed from the excavation by Kvaerner <br /> Approximately 100 pounds of dry Ice were added to the UST on March 4, 1999 A Lower Explosive <br /> Limit (LEL) meter was used to monitor vapor concentrations in the UST, and to ensure that the <br /> interior atmosphere did not exceed 10 percent of the lower explosive limit The UST had LEL <br /> readings of zero percent at the time of removal, with an oxygen concentration of 10 percent Cables <br /> were then attached to tank-Iift eyelets at the ends of the UST, and the UST was removed from the <br /> excavation with an excavator Residual soil was removed from the UST exterior surface to facilitate <br /> inspection for evidence of holes or leaks <br /> 44 Transportation and Disposal of 15,000-Gallon UST and Piping <br /> UST removal operations were performed on March 4, 1999 ECl/Enckson Inc transported the UST <br /> and piping to the ECl/Enckson tank cleaning facility in Richmond, California under a uniform <br /> hazardous waste manifest Copies of UST disposal documentation are is presented in Appendix B <br /> Followmg cleamng, the UST and piping were recycled as scrap metal <br /> 45 Collect Confirmatory Soil Samples <br /> ATC collected a total of six confirmation soil samples, and seven composite stockpile soil samples that <br /> were submitted for analytical testing on March 4, 1999 Five confirmatory soil samples designated E- <br /> 11 5', NW-13 5', SW-15', S-16', and N-16', were collected in the base of the UST excavation at <br /> depths ranging from 11 5 feet bgs to 16 feet bgs One sample designated PIPING-3 5' was collected <br /> beneath the product piping at a depth of 3 5' feet bgs Seven soil stockpile samples were designated <br /> SPI through SP7 Sampling locations are shown on Figure 3 and laboratory analytical results are <br /> presented in Table 5-1 The maximum depth of the tank vault was approximately 16 feet bgs Soil <br /> samples were collected as outlined in Appendix D <br /> • ATC Associates Inc 61059 0029 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.