My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007461 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2000
>
3500 - Local Oversight Program
>
PR0545768
>
ARCHIVED REPORTS_XR0007461 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:10:51 PM
Creation date
6/9/2020 10:30:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007461 CASE 1
RECORD_ID
PR0545768
PE
3528
FACILITY_ID
FA0003881
FACILITY_NAME
GENERAL MILLS
STREET_NUMBER
2000
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02903013
CURRENT_STATUS
02
SITE_LOCATION
2000 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br /> SITE CLOSURE REPORT <br /> General Mrlls, Inc <br />• 2000 west Turner Road <br /> Lodi, California <br /> Delta Project No D092-708 <br /> Page 2 <br /> storage tanks (USTs) as a preemptive measure for possible fuel shortages According to the General <br /> Mills engineer in charge of the tank replacement project, oil-stained soil was observed, however, no <br /> standing oil was present <br /> The three 12,000-gallon USTs were used to store No 6 heating oil The tanks were removed between <br /> October 11, and 17, 1991 After removing the tanks, the excavation of soil was contracted to Stockton <br /> Service Station Equipment Company of Stockton, California Following the excavation of soil, the tank <br /> excavation was backfilled from 15 feet bsg to approximately 5 feet bsg with well-graded gravel, and the <br /> remaining 5 feet was backfilled with silty sand <br /> On May 12, 1992, Delta observed the drilling of three soil borings to 50 feet bsg These borings were <br /> completed as ground water monitoring wells MW-1, MW-2, and MW-3 The results of this investigation <br /> are presented in DeIta's Hydrogeologlc Investigation Report, dated June 9, 1992 Ground water <br /> monitoring wells MW-1, MW-2, and MW-3 have been monitored since their installation in May 1992 <br /> Quarterly ground water sampling was conducted at the site for four consecutive quarters (May 1992 <br /> through March 1993), at which time the County, in their letter dated July 27, 1993, agreed to a request <br /> to reduce the monitoring well sampling frequency to semi-annual, provided that no petroleum <br /> hydrocarbons were detected <br /> In a letter dated February 17, 1993, the County requested that additional site assessment be performed <br /> at the site In this letter, the County stated that after evaluating soil with hydrocarbon concentrations <br /> remaining in place using the Leaching Potential Analysis, that additional investigation was required <br /> between 15 feet bsg and the top of ground water Delta responded to the County's request by presenting <br /> a Leaching Potential Analysis, in a letter dated March 18, 1993, utilizing information collected during <br /> the hydrogeologic investigation conducted at the site Delta's analysis indicated that the maximum <br /> allowable total petroleum hydrocarbon (TPH) as diesel No 6 (heating oil) concentration that could be <br /> left in place without posing a threat to ground water quality at 15 feet bsg (tank basin floor) is 1,000 parts <br />. per million (ppm) <br /> RPT 137 SIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.