Laserfiche WebLink
. QUARTERLY GROUNDWATER MONITORING AND SAMPLING REVIEW <br /> QUARTERLY GTS MONITORING AND SAMPLING REVIEW <br /> 4614 W TURNER RD. , LODI <br /> PAGE 2 <br /> Following the initial excavation, 15 soil borings were drilled, <br /> between May 15 and June 2 , 1989 Laboratory results of soil <br /> analyses determined the presence of petroleum hydrocarbons in <br /> concentrations exceeding 100 mg/kg in the area surrounding the <br /> tank excavation. After completion , 10 of the borings were <br /> converted to groundwater monitoring wells (Figure 2 ) Initial <br /> sampling of the wells indicated the presence of benzene in <br /> concentrations above the DHS Maximum Contaminant Levels (MCL ' s) <br /> for drinking water in three of the wells . <br /> In the fall of 1992 , a groundwater treatment system was installed <br /> in MW 1 . A report on the installation of this system has been <br /> submitted to San Joaquin Public Health Services and to Central <br /> Valley Regional Water Quality Control Board <br /> Groundwater and- Groundwater -Treatment System (GTS) Monitoring and <br /> Sampling _ <br /> Results from earlier quarterly samplings have been submitted in <br /> previous reports The quarterly sampling covered in this report <br /> was conducted by Caltest Analytical Laboratories The results of <br /> the findings are summarized in the following sections <br /> Groundwater levels are presented in Table 1 Analytical results <br /> are presented in Table 2 Copies of the laboratory reports are <br /> presented in Attachment I . <br /> THIRD QUARTER 1994 - Sampled on August 25 and September 6 , 1994 : <br /> Groundwater levels were obtained from monitoring wells #1 , #3 , <br /> and #5 Samples were obtained from monitoring wells #1 and #3 at <br /> the site Due to an error in sampling , monitoring well #1 had to <br /> be resampled on Sept 6 . Monitoring Well #1 has been converted <br /> into an extraction well However , the GTS was temporarily not <br /> operational , so the pump was removed from the well and a sample <br /> was taken with a bailer MW-9 was damaged in 1990 and cannot be <br /> sampled. The remaining wells were not scheduled to be sampled <br /> during this round of sampling The influent and effluent to the <br /> GTS were not sampled, as the system was temporarily not running <br /> Groundwater levels at the three points average 17 04 feet below <br /> the surface This represents an average drop of 0 . 47 feet from <br /> the second quarter of 1994 <br /> Lab analysis shows trace amounts of three contaminants in MW-1 <br /> 8 . 1 ppb Benzene, 6 8 ppb Ethylbenzene , and 7 . 8 ppb Xylene , no <br /> detectable toluene , and no detectable Total Petroleum <br /> . Hydrocarbons as Gasoline (TPHg) In MW-3 , lab analysis shows <br /> 120 . 0 ppb TPHg, and no detectable amounts of any other <br /> contaminants . <br />