My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007082
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1211
>
3500 - Local Oversight Program
>
PR0545771
>
ARCHIVED REPORTS_XR0007082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:09:39 PM
Creation date
6/9/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007082
RECORD_ID
PR0545771
PE
3528
FACILITY_ID
FA0009390
FACILITY_NAME
R&B AUTO REPAIR
STREET_NUMBER
1211
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
147-160-05
CURRENT_STATUS
02
SITE_LOCATION
1211 S TURNPIKE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i GROUNDWATER GRADIENT AND FLOW DIRECTION <br /> Fi4`ure 4 shows the groundwater elevation gradient and flow direction determined from <br /> depth to water measurements at the three on-site monitor wells on September 27, 2000 <br /> The groundwater elevation has decreased by an average of 1 3 feet at the three monitor <br /> v,ells since the previous quarterly monitoring round on June 8, 2000 The flow direction <br /> is to the west-northwest The overall gradient is 0 001 feet/linear foot <br /> RESULTS OF CERTIFIED ANALYSIS OF GROUNDWATER SAMPLES <br /> The results of the certified analyses of groundwater samples collected from the three <br /> monitor wells on September 27, 2400 are shown in Table 1 Copies of the laboratory <br /> reports are included as Appendix C of this report <br /> TPH-G concentrations ranged from a maximum of 16000 ug/l at monitor well MW 1 to <br /> 4200 u,,/l at monitor well MW2 <br /> Benzene concentrations ranged from a maximum of 7000 ug/1 at NM to 540 ug/l at <br /> MW2 <br /> MTBE concentrations ranged from a maximum of 67 ug/1 at MW3 to 25 ug/1 at MW2 <br /> • Neither 1,2 dichloroethane nor dibromoethane were detected in any of the three <br /> groundwater samples from MW1, MW2, or NIW3 <br /> Figure 5 shows the distribution of TPH-G, BTEX, and MTBE in groundwater and the <br /> estimated lateral limits of the TPH-G in groundwater as determined from groundwater <br /> _ samples collected on September 27, 2000 The decrease in overall groundwater elevation <br /> since the previous quarterly monitoring round was accompanied by an increase in TPH- <br /> G, BTEX, and MTBE concentrations at the three monitor wells <br /> RECOMMENDATIONS <br /> 1) Implement September 28, 1999 workplan to install additional groundwater <br /> monitoring wells following pre-approval of costs by the UST Cleanup Fund <br /> 2) Re-survey monitor well casing elevations at MWI, MW2, and MW3 following <br /> installation of additional monitoring wells to insure proper determination of groundwater <br /> gradient and flow direction <br /> s <br /> 3 Arc Pump QM 7-9, 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.