My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007072
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
ARCHIVED REPORTS_XR0007072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 3:38:16 PM
Creation date
6/10/2020 12:22:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007072
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rrr <br /> • 31 August 2004 <br /> AGE-NC Project No 95-0141 <br /> Page 4 of 6 <br /> 3 3 WELL DEVELOPMENT AND SURVEY <br /> Following installation, each well will be developed to maximize water flow and minimize the <br /> amount of fine-grained sediment drawn into the well during pumping or bailing After development, <br /> the top of each well casing(well head)will be surveyed to determine its elevation relative to mean <br /> sea level Procedures for well installation,development and survey are presented in Sections 4 2 and <br /> 4 3 , respectively <br /> 3 4 GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> Ground water monitonng and sampling events for each newly installed ground water monitoring <br /> well will be conducted on a quarterly basis until CVRWQCB approval or direction to do otherwise <br /> Ground water monitoring will include recording depth to ground water measurements, properly <br /> purging ground water monitoring wells and collection of ground water samples Ground water <br /> sample collection procedures are described in the AGE-prepared, EHD-approved Monitoring Well <br /> Installation Work Plan, dated 24 March 2000 <br /> • Ground water samples will be analyzed by a DHS-certified laboratory for the following constituents <br /> • TPH-g in accordance with EPA Method 8015 Modified/5030, <br /> • BTEX in accordance with EPA Method 826013, and <br /> • Fuel additives including DIPE, ETBE, MTBE, TAME, TBA, ethanol, methanol, EDB and <br /> 1,2-DCA in accordance with EPA Method 8260B <br /> Laboratory reports for ground water analyses,testing methods, laboratory quality assurance/quality <br /> control (QA/QC)reports, and sample chain of custody documentation will be presented in a report <br /> with the findings and recommendations <br /> 35 REPORT PREPARATION <br /> Following the completion of the proposed scope of work, a report will be prepared presenting the <br /> findings The report will include a description of work performed and the results of the <br /> soil/groundwater sampling and analysis Conclusions and recommendations will also be included <br /> in the reports,if applicable The report will be in a format acceptable to the EHD and the CRWQCB <br /> guidelines, and will be reviewed and signed by a California Registered Geologist <br /> Advanced GeoEnviron mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.