Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete(his section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified ❑X 3 GPH ❑0.1 GPH ❑0 2 GPH <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator lank systems.does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ I ❑ 1 ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ I ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ 1 ❑ ❑ <br /> For any answer of"N"above,describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM I PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used.(Do not complete this section) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> LG 91 STP X Pass <br /> ❑FailX❑Pass ❑Fail <br /> 17 DSL SiP ❑X Pass ❑Fail 0 Pass ❑Fail <br /> LB 87 Fill ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> L9 9t Fill ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> Lto D5L Fill ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> 011 87 Annular ❑X Pass ❑Fail Q Pass ❑Fail <br /> L12 911DSL Annular 0 Pass ❑Fail Q Pass ❑Fall <br /> L13 Vent Box ❑X Pass ❑Fail Q Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space ❑X Visual tnspeclion <br /> ❑Other(Describe the method in section XV below) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑X Yes ❑No(Describe the reason in section XV below) <br /> For any answer of"Fail"above,describe in Section XV how and when these issues were or will be corrected. <br /> XV, COMMENTS <br /> GPM=Gallons Per Hour,Y=Yes,N=No NA=Not Applicable,VPH=VacuurrVPressurehiydrostabc,ID=Identification <br />