Laserfiche WebLink
Emergency Shut-Off (ESO) Testing 20200037 <br /> Facility#:Arco 6080 Contractor:Gettler-Ryan Inc. <br /> Address:85 E Lousie Ave Address:6805 Sierra Ct. Suite G <br /> City, State:Lathrop, CA City, State:Dublin,CA 94568 <br /> Test Date:1/21/2020 Technician: Matthew Campbell <br /> The objective of this test is to provide assurance that when the ESO switch is activated, all the fueling system circuits <br /> (turbines, and dispensers)are de-energized,and remain de-energized until they are re-set manually. <br /> SWITCH# 1 2 3 4 5 <br /> Location of ESO Inside behind Outside on <br /> (be specific) counter building <br /> Type of Switch: Plain Plain <br /> Push Pull Momentary LighttToggle Light/Toggle <br /> Plain light/Toggle Other <br /> Type of Turbine Control Relay System: Power Solution <br /> Power Integrity Custom Fab. Square D <br /> Power Solution Carolina Box Brown Box <br /> PERFORMANCE TEST <br /> Does the ESO shutdown power to the Y <br /> DISPENSERS?(Y/N) Y <br /> Does the ESO shutdown power to the Y <br /> TURBINES?(YIN) Y <br /> OVERALL RESULT(Pass or Fail) PASS PASS <br /> If the test fails and cannot be fixed while onsite,call the Help Desk&document the ticket number <br /> If the test fails,contractor MUST: place an"Out of Service"tag on the ESO(s); &notify the site manager and teach them <br /> alternative emergency shut down procedures(i.e., locate circuit panel,clearly identify turbine and dispenser breakers for shut- <br /> off in the event of an emergency) <br /> REG <br /> ENTAL HEALTH <br /> E�!VIRpP, <br /> Fq-TNnVN1T <br />