My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 3:33:34 PM
Creation date
6/11/2020 3:27:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page a of s) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak defection monitoring. Y N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely O El El <br /> tested.and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with O 1-1 ❑ <br /> their ro er o eration? <br /> Was monitoring system set-up reviewed to ensure proper settings? a ❑ ❑ <br /> Was the monitoring panel s backup battery visually inspected functionally tested,and confirmed operational? X❑ ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary conla nment monitoring system fads to operate or is electrically <br /> disconnected? N ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply) 0 sump ❑X Under-D spenser Containment <br /> If alarms are relayed to a remote monitoring station,is all common cations equipment(e g modem)operational? Q ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑Check this box if tank gauging is used only for inventory control {Do not complete this sectron} <br /> ❑Check this box if NO tank gauging equipment is installed.(Do not complete this section) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection moniforin . <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination Including testing for O ❑ ❑ <br /> round faults? _ <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely functionally <br /> tested.and confirmed operational? ❑X ❑ ❑ <br /> Was accuracy of system's product level readings tested? O ❑ ❑ <br /> Was accuracy of system's water level readings tested? Z ❑ ❑ <br /> Were all probes reinstalled properly? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑X ❑ ❑ <br /> For any answer of"N"above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y=Yes,N=No NA=Not Appi cable <br />
The URL can be used to link to this page
Your browser does not support the video tag.