Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page a of s) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak defection monitoring. Y N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely O El El <br /> tested.and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with O 1-1 ❑ <br /> their ro er o eration? <br /> Was monitoring system set-up reviewed to ensure proper settings? a ❑ ❑ <br /> Was the monitoring panel s backup battery visually inspected functionally tested,and confirmed operational? X❑ ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary conla nment monitoring system fads to operate or is electrically <br /> disconnected? N ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply) 0 sump ❑X Under-D spenser Containment <br /> If alarms are relayed to a remote monitoring station,is all common cations equipment(e g modem)operational? Q ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑Check this box if tank gauging is used only for inventory control {Do not complete this sectron} <br /> ❑Check this box if NO tank gauging equipment is installed.(Do not complete this section) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection moniforin . <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination Including testing for O ❑ ❑ <br /> round faults? _ <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely functionally <br /> tested.and confirmed operational? ❑X ❑ ❑ <br /> Was accuracy of system's product level readings tested? O ❑ ❑ <br /> Was accuracy of system's water level readings tested? Z ❑ ❑ <br /> Were all probes reinstalled properly? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑X ❑ ❑ <br /> For any answer of"N"above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y=Yes,N=No NA=Not Appi cable <br />