Laserfiche WebLink
DRAFT <br /> SAN JOAQUIN COUNTY <br /> PROPOSED DEVELOPMENT TEXT AMENDMENT <br /> CHAPTER 9-1405 <br /> GRADING AND EXCAVATION REQUIREMENTS <br /> Section 9-1405 . 5 Removal From Site (Exceptions) <br /> (g) Removal of material for the excavation of private water <br /> supply and/or recreational ponds which meet all of the <br /> following: <br /> (1) The pond's high water surface area <br /> shall be a maximum of three (3) acres <br /> per parcel. <br /> (3) The parcel area shall have a minimum <br /> of two (2) acres of buildable area <br /> remaining after the ponds are <br /> complete. <br /> (4) The estimated water demand to fill and <br /> maintain the ponds, when averaged over <br /> a period of five (5) years, shall not <br /> be greater than the parcel's <br /> historical average water demand. <br /> (5) The groundwater quality shall not be <br /> adversely affected. <br /> (Cont'd. ) <br /> R•ILIA 7882=ROD 110-7-93 <br />