Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for ESCALON UNIFIED SCHOOL DIST as of June 12, <br /> 2020. <br /> Open violations from July 16, 2018 inspection <br /> Violation#203-Failure to implement the SPCC Plan. <br /> The SPCC plan states that Appendix E of the plan will be posted next to loading areas.Appendix E, describing <br /> unloading/loading procedures was not seen posted near the loading/unloading areas. The SPCC plan calls for spill <br /> kits to be placed near the dispensers, spill kits were not observed near the dispensers. The owner or operator or an <br /> onshore or offshore facility subject to this section must prepare in writing and implement a Spill Prevention Control <br /> and Countermeasure Plan (hereafter"SPCC Plan" or"Plan")," in accordance with§ 112.7 and any other applicable <br /> section of this part. Implement the SPCC plan as written or amend the plan to reflect actual facility procedures. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#301 -Failed to amend Plan as necessary. <br /> The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10,000 gallon <br /> diesel tank is no longer at the site and a square blue used oil tank outside of the diked area, near the oil water <br /> separator is not mentioned in the SPCC plan. The Spill Prevention, Control, and Countermeasure(SPCC)Plan <br /> must be amended when there is a change in the facility design, construction, operation, or maintenance that <br /> materially affects its potential for a discharge,within 6 months of the change, and implemented as soon as possible, <br /> not later than 6 months following preparation of the amendment. Immediately make all necessary amendments to <br /> the SPCC Plan to accurately represent the procedures and policies currently in place at the facility. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#302-Failed to review Plan once every five years and/or implement any resulting amendments. <br /> The Spill Prevention, Control, and Countermeasure(SPCC)Plan was last reviewed on April 9,2011 . A review and <br /> evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this review and <br /> evaluation,the SPCC Plan must be amended within 6 months of review, and recertified by a Professional Engineer <br /> if any technical amendments were made. Immediately conduct a review of the facility SPCC Plan and make any <br /> necessary amendments. <br /> Page 1 of 6 <br />