My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 10:26:05 AM
Creation date
6/12/2020 3:31:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528253
PE
2832
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
01
SITE_LOCATION
1176 STANISLAUS ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for ESCALON UNIFIED SCHOOL DIST as of June 12, <br /> 2020. <br /> Open violations from July 16, 2018 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#601 -Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure(SPCC)Plan does not follow the order or requirements in 40 <br /> CFR Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 <br /> for the Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include a <br /> cross-reference or to follow the required sequence. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#603-Failed to adequately describe the physical layout of the facility in the Plan. <br /> The facility diagram did not include buried piping and the locations of all regulated tanks was not accurate.The used <br /> oil tank inside the dike area has been removed. The Spill Prevention, Control, and Countermeasure(SPCC)Plan <br /> shall include a facility diagram which must mark the location and contents of each fixed storage container and the <br /> storage area where mobile or portable containers are located. It must identify the location of and mark as"exempt" <br /> underground tanks. It must also include all transfer stations and connecting pipes, including intra-facility gathering <br /> lines. Immediately update the facility diagram to include all of the required information. Submit a legible copy of the <br /> updated facility diagram to the EHD for review. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.