Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for ESCALON UNIFIED SCHOOL DIST as of June 12, <br /> 2020. <br /> Open violations from July 16, 2018 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#601 -Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure(SPCC)Plan does not follow the order or requirements in 40 <br /> CFR Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 <br /> for the Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include a <br /> cross-reference or to follow the required sequence. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#603-Failed to adequately describe the physical layout of the facility in the Plan. <br /> The facility diagram did not include buried piping and the locations of all regulated tanks was not accurate.The used <br /> oil tank inside the dike area has been removed. The Spill Prevention, Control, and Countermeasure(SPCC)Plan <br /> shall include a facility diagram which must mark the location and contents of each fixed storage container and the <br /> storage area where mobile or portable containers are located. It must identify the location of and mark as"exempt" <br /> underground tanks. It must also include all transfer stations and connecting pipes, including intra-facility gathering <br /> lines. Immediately update the facility diagram to include all of the required information. Submit a legible copy of the <br /> updated facility diagram to the EHD for review. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 6 <br />