Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> Table G-18 General Rule Requirements for Onshore Facilities N/A <br /> Facility Transfer Operations and Piping <br /> Buried piping that is installed or replaced on or after August 16, 2002 is provided with a protective <br /> wrapping and coating. Such buried piping installations is either cathodically protected or otherwise <br /> satisfies the corrosion protection standards for piping in 40 CFR part 280 of this chapter or a State ❑ II <br /> program approved under 40 CFR part 281 (such as California HSC Chapter 6.7 and 23 CCR <br /> requirements for underground storage tank systems). (§§112.8(d)(1) and 112.12(d)(1)] <br /> If a section of buried line is exposed for any reason, the facility will carefully inspect it for deterioration. If <br /> corrosion damage is found,the facility will undertake additional examination and corrective action as <br /> indicated by the magnitude of the damage. [See Inspection Log and Schedule in Attachment 3.1] ❑ II <br /> (§§112.8(d)(1) and 112.12(d)(1)] <br /> Terminal connections at transfer points are capped or blank-flanged and marked as to origin when piping <br /> is not in service or is in standby service for an extended time. (§§112.8(d)(2) and 112.12(d)(2)] II II <br /> Pipe supports are properly designed to minimize abrasion and corrosion and allow for expansion and II II <br /> contraction. (§§112.8(d)(3) and 112.12(d)(3)] <br /> Aboveground valves, piping, and appurtenances such as flange joints, expansion joints, valve glands and <br /> bodies, catch pans, pipeline supports, locking of valves, and metal surfaces are inspected regularly. [See II II <br /> Inspection Log and Schedule in Attachment 3.1] (§§112.8(d)(4) and 112.12(d)(4)] <br /> Integrity and leak testing are conducted on buried piping at the time of installation, modification, <br /> construction, relocation, or replacement. [See Inspection Log and Schedule in Attachment 3.1] ❑ II <br /> (§§112.8(d)(4) and 112.12(d)(4)] <br /> All vehicles entering the facility are warned to be sure that no vehicle will endanger aboveground piping <br /> or other oil transfer operations. [§§112.8(d)(5) and 112.12(d)(5)] <br /> CALIFORNIA FREIGHT ACAMPO <br /> Facility Name: Page 16 Tier I I Qualified Facility SPCC Plan <br />