My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2800 - Aboveground Petroleum Storage Program
>
PR0528459
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
6/12/2020 3:32:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528459
PE
2832
FACILITY_ID
FA0010217
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> Table G-19 General Rule Requirements for Onshore Oil Production Facilities N/A <br /> All aboveground valves and piping associated with transfer operations are inspected periodically and ❑ ❑x <br /> upon a regular schedule. The general condition of flange joints, valve glands and bodies, drip pans, pipe <br /> supports, pumping well polish rod stuffing boxes, bleeder and gauge valves, and other such items are <br /> included in the inspection. See Inspection Log and Schedule in Attachment 3.1 112.9(d)(1)1 <br /> An oil spill contingency plan and written commitment of resources are provided for flowlines and intra- ❑ ❑x <br /> facility gathering lines [See Oil Spill Contingency Plan and Checklist in Attachment 2 and Inspection <br /> Log and Schedule in Attachment 3.1] (§112.9(d)(3)] <br /> or <br /> Appropriate secondary containment and/or diversionary structures or equipment is provided for flowlines ❑ ❑x <br /> and intra-facility gathering lines to prevent a discharge to navigable waters or adjoining shorelines. The <br /> entire secondary containment system, including walls and floor, is capable of containing oil and is <br /> constructed so that any discharge from the pipe, will not escape the containment system before cleanup <br /> occurs. <br /> A flowline/intra-facility gathering line maintenance program to prevent discharges from each flowline has ❑ ❑x <br /> been established at this facility. The maintenance program addresses each of the following: <br /> • Flowlines and intra-facility gathering lines and associated valves and equipment are compatible ❑ ❑x <br /> with the type of production fluids, their potential corrosivity, volume, and pressure, and other <br /> conditions expected in the operational environment; <br /> • Flowlines, intra-facility gathering lines and associated appurtenances are visually inspected ❑ ❑x <br /> and/or tested on a periodic and regular schedule for leaks, oil discharges, corrosion, or other <br /> conditions that could lead to a discharge as described in §112.1(b). The frequency and type of <br /> testing allows for the implementation of a contingency plan as described under part 109 of this <br /> chapter. <br /> • Corrective action and repairs to any flowlines and intra-facility gathering lines and associated ❑ ❑x <br /> appurtenances as indicated by regularly scheduled visual inspections, tests, or evidence of a <br /> discharge. <br /> • Accumulations of oil discharges associated with flowlines, intra-facility gathering lines, and ❑ ❑x <br /> associated appurtenances are promptly removed. 112.9(d)(4)1 <br /> The following is a description of the flowline/intra-facility gathering line maintenance program implemented at this <br /> facility: <br /> NEED TO ADD SECTION ITEMS FOR 112.9(c)(6)(i - v) and 112.9(d)(2) and (5). <br /> CALIFORNIA FREIGHT ACAMPO <br /> Facility Name: Page 18 Tier I I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.