My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2800 - Aboveground Petroleum Storage Program
>
PR0528459
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
6/12/2020 3:32:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528459
PE
2832
FACILITY_ID
FA0010217
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> C. Onshore Oil Drilling and Workover Facilities (§112.10(b), (c) and (d)): <br /> The owner or operator must meet the general rule requirements as well as the requirements under this section. <br /> Table G-20 General Rule Requirements for Onshore Oil Drilling and Workover Facilities <br /> Mobile drilling or worker equipment is positioned or located to prevent discharge as described in §112.1(b). <br /> [§112.10(b)] <br /> Catchment basins or diversion structures are provided to intercept and contain discharges of fuel, crude oil, or <br /> oily drilling fluids. 112.10 c <br /> A blowout prevention (BOP) assembly and well control system was installed before drilling below any casing <br /> string or during workover operations. 112.10 d <br /> The BOP assembly and well control system is capable of controlling any well-head pressure that may be ❑ <br /> encountered while the BOP assembly and well controls stem are on the well. 112.10 d <br /> CALIFORNIA FREIGHT ACAMPO <br /> Facility Name: Page 19 Tier I I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.