Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> C. Onshore Oil Drilling and Workover Facilities (§112.10(b), (c) and (d)): <br /> The owner or operator must meet the general rule requirements as well as the requirements under this section. <br /> Table G-20 General Rule Requirements for Onshore Oil Drilling and Workover Facilities <br /> Mobile drilling or worker equipment is positioned or located to prevent discharge as described in §112.1(b). <br /> [§112.10(b)] <br /> Catchment basins or diversion structures are provided to intercept and contain discharges of fuel, crude oil, or <br /> oily drilling fluids. 112.10 c <br /> A blowout prevention (BOP) assembly and well control system was installed before drilling below any casing <br /> string or during workover operations. 112.10 d <br /> The BOP assembly and well control system is capable of controlling any well-head pressure that may be ❑ <br /> encountered while the BOP assembly and well controls stem are on the well. 112.10 d <br /> CALIFORNIA FREIGHT ACAMPO <br /> Facility Name: Page 19 Tier I I Qualified Facility SPCC Plan <br />