My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:45:15 PM
Creation date
6/12/2020 5:07:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0220094
PE
2249
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
481
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMIDEN WIRE PRODUCTS CORPORATION <br /> JOB DESCRIPTION <br /> JOB TITLE: PICKLING/WASTEWATER TREATMENT OPERATOR <br /> EXEMPT: No <br /> SALARY LEVEL: HOURLY <br /> SHIFT: AS ASSIGNED <br /> LOCATION: STOCKTON <br /> EMPLOYEE: <br /> REPORTS TO: SHIFT SUPERVISOR <br /> PREPARED BY: WAYNE MANNOR DATE: 6-12-96 <br /> APPROVED BY: WILLIAM PALMER REVISED: by wm DATE: 8-7-06 <br /> SUMMARY <br /> Sets up, operates and controls the Pickling and Coating of High Carbon Steel Rod coils by <br /> removing the heat scale, rust, dirt etc. from raw materials, rinsing in fresh water baths and <br /> coating in a rust inhibitor bath of select coatings such as lime, borax, zinc phosphate etc. <br /> Operates a clarifier and filter press when necessary in wastewater balance area and installs <br /> empty or removes full, ferrous sulfate super sacks from an Acid Recovery System. <br /> ESSENTIAL DUTIES AND RESPONSIBILITIES <br /> SAFETY - QUALITY - COST - DELIVERY <br /> Turns valve to add acid to processing tank and adds inhibitor into tank to obtain baths of <br /> specified acid and inhibitor concentrations. <br /> Uses overhead bridge crane and moves raw material coils through the line, to Pickle and Rinse <br /> in preparation for coating operation. <br /> Examines surface of coil to verify the complete removal of all heat scale, rust, dirt etc. <br /> Opens Fiber drums and adds coating materials to coating bath using scoops and/or shovel <br /> to specified concentrations for proper coating per company specifications. <br /> Uses overhead bridge crane and moves pickled coil through the coating tank, and deposits <br /> the finished coated coil on the floor area, where the Pickling Operator will then transport <br /> the pickled, coated coil to the Drawing Department as designated by published work orders. <br /> Test solution concentrations in acid bath and coating bath for concentrations of pH, Fe, Points <br /> of coating, % of acid, inhibitors and makes adjustments to ensure conformance to all <br /> company specifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.