My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:45:15 PM
Creation date
6/12/2020 5:07:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0220094
PE
2249
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
481
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMIDEN WIRE PRODUCTS CORPORATION <br /> JOB DESCRIPTION <br /> JOB TITLE: P C REWINDER OPERATOR <br /> EXEMPT: No <br /> SALARY LEVEL: HOURLY <br /> SHIFT: AS ASSIGNED <br /> LOCATION: STOCKTON <br /> EMPLOYEE: <br /> REPORTS TO: SHIFT SUPERVISOR <br /> PREPARED BY: WAYNE MANNOR DATE: 6-12-96 <br /> APPROVED BY: WILLIAM PALMER REVISED: by wm DATE: 8-7-06 <br /> SUMMARY <br /> Operates Rewinder Machine, to make organized Finished Pack of Strand from Random Wound <br /> Strand, delivered to Take-Up Drum from the Stranding Machine. <br /> ESSENTIAL DUTIES AND RESPONSIBILITIES <br /> Include the following, however, other duties may be assigned. <br /> SAFETY - QUALITY - COST - DELIVERY <br /> Lifts and installs core board as required, on machine drum, and closes Rewinder Machine in <br /> Preparation to run machine. <br /> Installs end of Strand in Rewinder Machine Clamp and starts machine, and observes operation. <br /> Tends machine &shuts machine down when pack length is reached &cuts strand with chop saw. <br /> Cuts Strand Samples from each pack for QA/QC testing as directed. <br /> Bands the finished Pack using Automatic Signod Bander Machine or Hand Held Bander <br /> Releases Machine Locks and opens Machine and remove Pack using Hydraulic Table <br /> Transports Finished Pack to Scales using overhead Bridge Crane and weighs Pack. <br /> Records weight to Pack Tag and to Daily Shift Report and to Test Result of Strand Report. <br /> Removes empty spools from Stranding Machine and Installs Full spools of wire to Stranding <br /> Machine and works regularly as helper to Stranding Machine Operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.