My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRETHEWAY
>
21167
>
2900 - Site Mitigation Program
>
PR0545760
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 10:14:07 AM
Creation date
6/15/2020 10:11:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545760
PE
2952
FACILITY_ID
FA0023669
FACILITY_NAME
MILDRED DE VINCENZI
STREET_NUMBER
21167
Direction
N
STREET_NAME
TRETHEWAY
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01726038
CURRENT_STATUS
02
SITE_LOCATION
21167 N TRETHEWAY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J�F <br /> 10/16/1991 Revised workplan submitted to EHD. ::. j <br /> 10/24/1991 Additional spoil removed from fromijsouth side of <br /> excavation where prior sampling had revealed con- <br /> tamination. A small area on the north wall was <br /> also re-excavated. 5 soil samples:!Iwere taken and <br /> analyzed for BTEX, EDB, TPH-G, TPH=D, ,& oil and <br /> grease. <br /> i 10/31/1991 Laboratory results showed that alli'stested sub-- <br /> stances were below detection ..1imi.ts, exceptAoi1 __ <br /> grease, That test" 'was run using I:method'"S!"1503C; <br /> which was an incorrect procedure. �I <br /> # 11/13/1991 The samples were" retested using EPA Method 418. 1; <br /> that analysis revealed that all sa'M` ples were be- <br /> low detection levels, <br /> 1/17/1992 FGL Environmental wrote to EHD explaining differ- <br /> ence in the results' between the two procedures, <br /> and provided additional backup data to show that <br /> the results of Method 418. 1 were correct. ' <br /> NOTE: Spoil pile has been characterized and accepted by <br /> Forward, it. will be delivered to them and the r <br /> ` existing excavation will be filled;,and properly <br /> compacted when weather permits,. <br /> cc: Ann Dito <br /> Jim Thorpe Oil <br /> IA. <br /> f a <br /> 1 . <br /> S ' <br /> M <br /> h <br /> G <br /> i!' li <br /> i. <br /> i " ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.