Laserfiche WebLink
• <br /> 8 All operations will be performed in accordance with the <br /> Health & Safety plan previously submitted to the County <br /> It is estimated that 340 cubic yards of spoil is presently <br /> stored on site Approximately 200 cubic yards will be <br /> removed under this workplan, which would produce a total of <br /> 540 cubic yards of spoil at the completion of excavation <br /> operations <br /> Until contamination from the site of the removed UST has <br /> been satisfactorily removed, and the final amount of spoil <br /> has been determined, it is not possible to solicit and <br /> review remediation proposals from qualified firms At the <br /> present time, options would appear to include soil-vapor <br /> extraction, bio-remediation, or removal to an approved <br /> facility When an acceptable plan has been selected by our <br /> client, it will be submitted to the County for review and <br /> comment <br /> After evaluating the results of the laboratory analyses of <br /> the soil samples from the excavation and the spoil , <br /> additional programs or recommendations will be prepared and <br /> submitted to the County staff for review and action It is <br /> not known at this time whether the excavation will be filled <br /> • with clean spoil or left open pending remediation of the <br /> spoil on-site, that decision will depend upon the results of <br /> the laboratory analysis of the soil samples <br /> William d ter <br /> s zt_D GEp, <br /> cc Thorp Oil <br /> c�U <br /> A Ditto ti,1LLV� J' 11LINH <br /> ir NO "M <br /> 9 <br />