My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
11225
>
2900 - Site Mitigation Program
>
PR0517541
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:49:42 AM
Creation date
6/15/2020 2:25:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0517541
PE
2950
FACILITY_ID
FA0013499
FACILITY_NAME
HWY 26 QUICK STOP
STREET_NUMBER
11225
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95206
APN
08919004
CURRENT_STATUS
01
SITE_LOCATION
11225 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 Octover 2001 <br /> AGE-NC Project No. 01-0871 <br /> Page 3 of 7 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> gloves <br /> safety lasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations.No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Calvin Lee Collect soil/ground water samples; direct <br /> drilling <br /> FIELD CREW: TASK: <br /> Drill Rig Operator Advance borings <br /> Field Technician (if nec.) 1 Clean equipment <br /> The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.