My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2900 - Site Mitigation Program
>
PR0545713
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:20 PM
Creation date
6/15/2020 2:29:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545713
PE
2965
FACILITY_ID
FA0013507
FACILITY_NAME
VAN RUITEN FAMILY WINERY
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05802005
CURRENT_STATUS
02
SITE_LOCATION
340 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTIN tOGRAM NO.R5-2003-0179 -2- <br /> VAN RUITEN-TAYLOR RANCH LTD. <br /> VAN RUITEN-TAYLOR WINERY LLC <br /> SAN JOAQUIN COUNTY <br /> Constituent Units Type of Sample Sampling Reporting <br /> Frequency FrequencX <br /> pH pH units Grab Weekly Monthly <br /> BODS' mg/L Grab Monthly Monthly <br /> Nitrate as Nitrogen mg/L Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/L Grab Monthly Monthly <br /> Total Dissolved Solids mg/L Grab Monthly Monthly <br /> Volatile Dissolved Solids mg/L Grab Monthly Monthly <br /> Five-day,20°Celsius Biochemical Oxygen Demand. <br /> STORMWATER POND MONITORING <br /> The stormwater pond shall be monitored whenever there is water in it. If the pond is dry, the <br /> monitoring reports shall so state. Samples shall be collected from an established sampling station <br /> located in an area that will provide representative samples. Monitoring of the pond shall include, at a <br /> minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> pH pH units Grab Weekly Monthly <br /> Electrical Conductivity µmhos/cm Grab Weekly Monthly <br /> Total Dissolved Solids mg/1 Grab Monthly Monthly <br /> Nitrate as Nitrogen mg/1 Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/1 Grab Monthly Monthly <br /> BODS mg/1 Grab Monthly Monthly <br /> LAND APPLICATION AREA MONITORING <br /> The Discharger shall monitor process wastewater discharged for irrigation to the land application area. <br /> Monitoring shall be conducted daily during operation and the results shall be included in the monthly <br /> monitoring report. Evidence of erosion, field saturation, runoff, or the presence of nuisance conditions <br /> shall be noted in the report. Loading rates for the land application areas shall be calculated. <br /> Monitoring of the land application areas shall include the following: <br /> Type of Sampling Reporting <br /> Constituent Units Sade FrequencX Frequency <br /> Wastewater Flow Gallons Continuous) Daily Monthly <br /> Supplemental Irrigation Flow Gallons Continuous) Daily Monthly <br /> Acreage Applied Acres Calculated Daily Monthly <br /> Application Rate gal/acre-day Calculated Daily Monthly <br /> BOD Loading Rate lbs/acre-month Calculated Daily Monthly <br /> Total Nitrogen Loading Rate3 lbs/acre•month4 Calculated Monthly Monthly <br />
The URL can be used to link to this page
Your browser does not support the video tag.