Laserfiche WebLink
MONITORING AND REPORTINC. _.OGRAM NO. R5-2003-0179 -3- <br /> VAN RUITEN-TAYLOR RANCH LTD. <br /> VAN RUITEN-TAYLOR WINERY LLC <br /> SAN JOAQUIN COUNTY <br /> Type of Sampling Reporting <br /> Constituent Units Sample Frequency Frequency <br /> TDS Loading Rate lbs/acre•month4 Calculated Monthly Monthly <br /> I Continuous monitoring requires daily meter reading or automated data collection. <br /> Z Land Application Area(s) in use shall be identified by name or number and the acreage provided. If a portion of an <br /> area is used,then the acreage shall be estimated. <br /> 3 Total nitrogen applied from all sources, including fertilizers and supplemental irrigation water if used. <br /> a Report monthly total and cumulative annual to date. <br /> At least once per week when wastewater is being applied to the land application areas, the entire <br /> application area shall be inspected to identify any equipment malfunction or other circumstance that <br /> might allow irrigation runoff to leave the area and/or create ponding conditions that violate the Waste <br /> Discharge Requirements. A log of these inspections shall be kept at the facility and be submitted with <br /> the monthly monitoring reports. If wastewater was not applied to the land application area, then the <br /> monthly monitoring reports shall state that. <br /> SOLIDS MONITORING <br /> The Discharger shall record and report monthly the quantity, disposal location, and method of disposal <br /> of solids disposed of during the processing season, as well as during the off-season, if applicable. If <br /> solid waste is shipped offsite, then an estimated amount and location of disposal shall be reported in <br /> the monthly report and the hauler identified. <br /> GROUNDWATER MONITORING <br /> Groundwater monitoring shall commence with the third quarter 2004. Prior to construction and/or <br /> sampling of any groundwater monitoring wells, the Discharger shall submit plans and specifications to <br /> the Board for approval. Once installed, all new wells shall be added to the monitoring network and <br /> shall be sampled and analyzed according to the schedule below. All samples shall be collected using <br /> approved EPA methods. Water table elevations shall be calculated to determine groundwater gradient <br /> and direction of flow. <br /> Prior to sampling, the groundwater elevations shall be measured and the wells shall be purged at least <br /> three well volumes until temperature, pH, and electrical conductivity have stabilized. Depth to <br /> groundwater shall be measured to the nearest 0.01 feet. Groundwater monitoring shall include, at a <br /> minimum, the following: <br /> Type of Sampling Reporting <br /> Constituent Units Sam Frequency' Frequency4 <br /> Depth to Groundwater ±0.01 feet Measurement Quarterly Quarterly <br /> Groundwater Elevation' ±0.01 feet Calculated Quarterly Quarterly <br /> Gradient feet/feet Calculated Quarterly Quarterly <br />