My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2900 - Site Mitigation Program
>
PR0545713
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:20 PM
Creation date
6/15/2020 2:29:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545713
PE
2965
FACILITY_ID
FA0013507
FACILITY_NAME
VAN RUITEN FAMILY WINERY
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05802005
CURRENT_STATUS
02
SITE_LOCATION
340 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTINL.ROGRAM NO.R5-2003-0179 -5- <br /> VAN RUITEN-TAYLOR RANCH LTD. <br /> VAN RUITEN-TAYLOR WINERY LLC <br /> SAN JOAQUIN COUNTY <br /> 4. A calibration log verifying calibration of all hand held monitoring instruments and devices <br /> used to comply with the prescribed monitoring program; <br /> 5. The total pounds of total dissolved solids (year to date) that have been applied to the land <br /> application area, as calculated from the sum of monthly loadings; and <br /> 6. The total pounds of nitrogen(year to date, from all sources including fertilizer) applied to <br /> the land application area as calculated from the sum of monthly loadings. <br /> B. Quarterly Report <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such <br /> that samples are obtained approximately every three months. Quarterly monitoring reports shall <br /> be submitted to the Regional Board by the 1St day of the second month after the quarter (Le. <br /> the January-March quarter is due by May I") each year. The Quarterly Report shall include the <br /> following: <br /> 1. Results of groundwater monitoring; <br /> 2. A narrative description of all preparatory, monitoring, sampling, and analytical testing <br /> activities for the groundwater monitoring. The narrative shall be sufficiently detailed to <br /> verify compliance with the WDR, this MRP, and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting <br /> depth to groundwater; parameters measured before, during, and after purging; method of <br /> purging; calculation of casing volume; and total volume of water purged; <br /> 3. Calculation of groundwater elevations, an assessment of groundwater flow direction and <br /> gradient on the date of measurement, comparison of previous flow direction and gradient <br /> data, and discussion of seasonal trends if any; <br /> 4. A narrative discussion of the analytical results for all groundwater locations monitored <br /> including spatial and temporal tends, with reference to summary data tables, graphs, and <br /> appended analytical reports (as applicable); <br /> 5. A comparison of monitoring data to the groundwater limitations and an explanation of any <br /> violation of those requirements; <br /> 6. Summary data tables of historical and current water table elevations and analytical results; <br /> 7. A scaled map showing relevant structures and features of the facility, the locations of <br /> monitoring wells and any other sampling stations, and groundwater elevation contours <br /> referenced to mean sea level datum; and <br /> 8. Copies of laboratory analytical report(s) for groundwater monitoring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.