Laserfiche WebLink
MONITORING AND REPORTIT ROGRAM NO.R5-2003-0179 -4- <br /> VAN RUITEN-TAYLOR RANCH LTD. <br /> VAN RUITEN-TAYLOR WINERY LLC <br /> SAN JOAQUIN COUNTY <br /> Type of Sampling Reporting <br /> Constituent Units Sample Frequency' Frequency4 <br /> Gradient Direction Degrees Calculated Quarterly Quarterly <br /> pH pH units Grab Quarterly Quarterly <br /> Specific Conductivity µmhos/cm Grab Quarterly Quarterly <br /> Nitrate as Nitrogen mg/L Grab Quarterly Quarterly <br /> Total Kjeldahl Nitrogen mg/L Grab Quarterly Quarterly <br /> Total Dissolved Solids mg/L Grab Quarterly Quarterly <br /> Standard Minerals2,3 mg/L Grab Annual Annual <br /> 1 Groundwater elevation shall be determined based on depth-to-water measurements from a surveyed measuring point <br /> elevation on the well. <br /> ' Standard Minerals shall include at least the following compounds: calcium,magnesium,potassium,sodium, <br /> chloride, sulfate,total alkalinity(including alkalinity series), and hardness <br /> 3 Standard Minerals shall be analyzed in the fourth quarter of the year. <br /> a Beginning with the third quarter,2004. <br /> REPORTING <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> sample type (e.g., process wastewater effluent, groundwater well, etc.), and reported analytical result <br /> for each sample are readily discernible. The data shall be summarized in such a manner to clearly <br /> illustrate compliance with waste discharge requirements and spatial or temporal trends, as applicable. <br /> The results of any monitoring done more frequently than required at the locations specified in the <br /> Monitoring and Reporting Program shall be reported in the next scheduled monitoring report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the direct supervision of a registered <br /> professional engineer or geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Monthly reports shall be submitted to the Regional Board by the Vt day of the second month <br /> following the end of the reporting period (i.e. the January monthly report is due by 1 March). <br /> Monthly reports for the months of March, June, September, and December may be submitted as <br /> part of the Quarterly Monitoring Report, if desired. The monthly reports shall include the <br /> following: <br /> 1. Results of influent,process wastewater effluent, stormwater pond, land application area, and <br /> solids monitoring; <br /> 2. A comparison of monitoring data to the discharge specifications and an explanation of any <br /> violation of those requirements. Data shall be presented in tabular format; <br /> 3. If requested by staff, copies of laboratory analytical report(s); <br />