Laserfiche WebLink
1 <br /> STATE OF CALIFORNIA•DEPARTMENT OF TRANSPORTATION Page 1 of 2 <br /> STORM WATER SPECIAL PROVISIONS for MINIMAL or NO IMPACT <br /> TR-0400(Rev 09/2012) <br /> I. GENERAL: The purpose of these Special Provisions is to roadways. If leaks cannot be repaired immediately, remove the <br /> provide the Permittee with specifications for water pollution control vehicle or equipment from the job site. <br /> to minimize,prevent;or control the discharge of material into the <br /> air, surface waters, groundwater, and stone sewers owned by the 7. 14LA1.N'I'ENA.i\CE Al\"D M7ELI1G OF VEHICLES AND <br /> State or local agencies.These provisions are not intended to take theEQUIPN'LENT:Maintenance and fueling ofequipment shall not <br /> place of the Caltrans Water Pollution Control Program(WPCP)for result in any pollution at the job site.The Permittee shall <br /> projects where soil disturbance from work activities less than one immediately clean up spills/leaks,and properly dispose of <br /> acre, or work activities of one acre or more subject to the contaminated soil and materials. <br /> preparation of the Caltrans Storm Water Pollution Prevention Plan <br /> (SWPPP) that would require a waste discharge identification S. CLEA'\"L\G VEHICLES A\-D EQLZP1MNYr: Limit vehicle <br /> number or coverage under the California Construction General and equipment cleaning or washing at the job site except what is <br /> Permit(Order No.2009-0009-DWQ /bPDL3&'C�S00000?).The necessary to control vehicle tracking or hazardous waste. The <br /> Permittee shall comply with the following Special Provisions and Permittee shall clean all equipment within a bermed area or over a <br /> Elie direction of the State Representative. drip pan large enough to prevent run-off. No soaps, solvents, <br /> degreasers,etc shall be used in State right of way. Any water from <br /> 2. NPDES REQLTREiMENTS:The Permittee shall be responsible this operation shall be collected and disposed of at an appropriate <br /> for full compliance with the Caltrans Storm Nater Program and the site. Containment berms or dikes shall be used for fueling, <br /> Caltrans National Pollutant Discharge Elimination System areas. Z maintaining and washing vehicles t equipment a outside <br /> areas. Containment must be performed at least 100 feet from <br /> (NtPDES)Permit requirements.It is the Petmitte's responsibility to concentrated flows of storm water, drainage courses, and storm <br /> install,inspect,and repair or maintain facilities and devices used for drain inlets if within a flood plain, otherwise at least 50 feet if <br /> water pollution control practices before performing daily work <br /> activities. Installation and maintenance responsibilities on the job outside the floodplain.Keep adequate quantities of absorbent spill- <br /> site include: I) soil stabilization materials in work areas that are cleanup material and spill kits in the fueling or maintenance area <br /> and on fueling trucks. <br /> inactive or prior to storm events, 2)water pollution control devices <br /> to control sediment and erosion,3)implementation of spill and leak 9, DIESEL FUELS: The use of diesel fuel from petroleum or <br /> prevention procedures for chemical and hazardous substances other fossil fuel as a form-oil or solvent is not allowed. <br /> stored on the job site.4)material storage,5)stockpile management, <br /> 6) waste management, 7) non-stormwater management; 8) water 10. «'FATHER CONDITIONS AT WORKSITE: Any activity <br /> conservation, and 9) illicit connection, illegal discharge detection that would generate fine particles or dust that could be transported <br /> and reporting.The Permittee shall report to the state representative off site by stormwater shall be performed during dry weather. <br /> when discharges enter into receiving waters, adjacent property, <br /> drainage systems or when discharges could be a cause or a threat for 11. HOT MIX ASPHALT:Runoff from washing hot mix asphalt <br /> water pollution.The Permittee shall also control illicit discharges or shall not enter into any drainage conveyances. <br /> illegal dugnping_priR to start of dai!_y_work_sc e¢ule. copies of..__ <br /> written notices or orders from the Regional Water Quality Contra! 12,.--PROTECTIO.N--OF--DR:UN'Ai3E--FACit-Cit <br /> The <br /> Board or other regulatory agency shall be provided to the State Permittee shall protect/cover gutters,ditches,dranage courses,and <br /> representative within 48 hours of reported activity. For additional inlets with gravel bis,fiber rolls,Staee approved fabric filters,etc., <br /> to the satisfaction of the State representative during wading,paving. <br /> information on storm water compliance, visit the State Water <br /> Resources Control Boards storm water Website at saw-cutting, etc. and materials must conform to Section 13-6.02 <br /> hrml,'ww�+r-:vaEzt'voatds c�sor'/Hatt[ ksae�prosrams/stomivater Materials for Water Pollution Control of the State of California <br /> standard specifications for construction(most Current version).No <br /> 3. RESPO\S113 LITY FOR DEBRIS REMOVAL: The such protection measures shall cause an obstruction to the traveling <br /> Permittee shall be responsible for preventing sediment, trash, public. The Permittee shall implement spill and leak prevention <br /> debris, and other construction waste from entering the street, the procedures for chemicals and hazardous substances stored on the <br /> storm drains,local creeks,or any other bodies of water. job site in accordance to section 13-4.03B(1-3)Spill Prevention and <br /> Control,Water Pollution Control,of the State of California standard <br /> 4. SPOILS 42\'D RESIDUE: The Permittee shall vacuum any specifications for construction(2010 version). <br /> saw-cut concrete waste material, debris, residue, etc, ',\To spoils, <br /> debris,residue,etc.shall be washed into a drainage system. 13. PAIINT: Rinsing of painting equipment and materials is not <br /> permitted in state right-of-way. When thoroughly dry, dispose of <br /> 5. SWEEPING:Sweep paved roads at construction entrance and the following as solid waste: dry latex paint, paint cans, used <br /> exit locations and surrounding paved areas daily within the job site brushes, rags, gloves, absorbent materials, and drop cloths. Oil <br /> during: 1)clearing and grubbing,2)earthwork,3)trenching,4)sail based paint sludge and unusable thinner shall be disposed of at an <br /> disturbance,5)pavement grinding and/or cutting,and 6)after approved hazardous waste site. <br /> observing tracking of material onto or off the State property. Keep 14. CONSTRUCTION' 1LATERLALS: Stockpile of' all <br /> dust to a minimum during sweeping activities.Use vacuum construction materials,including,but not limited to;pressure treated <br /> whenever dust generation is excessive or sediment pickup is wood, asphalt concrete,cold mix asphalt concrete,concrete,grout, <br /> ineffective.Roadways or work areas shall not be washed down with cement containing prembces, and mortar, shall conform to section <br /> water.Street sweeping operations must conform to Section 13 13-4.03C Material Management (Storage & Stockpiles), Water <br /> Water Pollution Control of the State of California standard Pollution Control,of the State of California standard specifications <br /> specifications for construction(most current version) for construction(2010 version). <br /> htip://mwv.dm.ca sov./hq/esa'oe/spec i 6cations!SSPs'2010-5 SPs/. <br /> 6. VEMCLES AND EQUINMENT: Permittee shall prevent ail 15. CO\CRETE EQLTPME\T: Concrete equipment shall be <br /> vehicles, equipment, etc. from leakage or mud tracking onto washed in a designated washing_area in a way that does not <br /> contaminate soil,receiving waters,or storm drain systems. <br />