Laserfiche WebLink
CLEARWATER <br /> G R O U P, I N C. <br /> The groundwater gradient at the subject location may be inconsistent with the local <br /> gradient for the following reasons: <br /> • The gradient (calculated on the basis of the existing'three monitoring wells) is <br /> I <br /> flat; the difference in groundwater elevations is only 0.04 to 0.06 foot <br /> - i <br /> The three wells are in close proximity to one another (the maximum distance <br /> between any two wells is approximately 75 feet) . <br /> i The spatial arrangement of the wells 15 not the optimum geometry for <br /> calculation of the data, given only three data points and the relatively flat <br /> gradient. <br /> II <br /> 4.2 .Groundwater Sample Analytical Results <br /> TPHg, TPHd, and BTEX were not detected -Ln concentrations exceeding method <br /> detection limits in any of the three groundwater samples (Table 1). Concentrations <br /> of TPHd ranged from 100 to 530 ppb in samples collected during the two previous <br /> sampling events. <br /> ' <br /> - On November 13, AEN- was requested to r -evaluate the results of the TPHd ; <br />_ analyses in all three samples. Laboratory personnel re-integrated the <br /> chromatographs, and the original analytical results indicating nondetectable TPHd <br /> were confirmed. Analytical results are 'disp ayed graphically on Figure 4; and <br /> laboratory reports and chain-of-custody forms a e attached as Appendix B. <br /> 5.0 RECOMMENDATIONS <br /> Petroleum hydrocarbons were not detected i i any sample collected during this j <br /> monitoring event. Historically, gasoline consti ents have not been detected in any <br /> of the samples analyzed, although samples f om all three wells have contained <br /> TPHd. Clearwater recommends that these sults be confirmed by resampling <br /> groundwater for at least two more quarters. <br /> On October 4, 1995 Clearwater submitted the Workplan for Additional Site <br /> Assessment to Mr. Ron Rowe of the PHS/EI-11). The Workplan proposes drilling <br /> one soil boring in the former fuel dispenser location and installing four monitoring <br /> D-144 3Q95 3 November 28,1995 I <br /> t <br /> I <br />