F - <br /> FF <br /> F diameter, flush threaded, Schedule 40 PVC blank casing from the ground surface to <br /> 23 feet below grade and 0.020-inch slotted casinE from 23 to 25 feet bgs. The annular <br /> space through the screened interval will be filled with clean uniform sand to a <br /> F_ depth of 22 feet bgs. A two-foot thick hydrated bentonite seal will be placed above the <br /> t= sandpack, and the annular space above the seal will be filled with grout. The top of <br /> the well casings will be capped above grade and locked with an expansion plug, and <br /> a traffic rated road box. The dimensions of well construction as described above are <br /> approximate and may vary according to conditions encountered in the field. <br /> Due to the fact that the extent of hydrocarbons in the soil has been sufficiently <br /> delineated the borings for these hese wells will not be exploratory. Soil samples will not <br /> be collected or analyzed. <br /> All downhole drilling equipment will be steam cleaned between boreholes and the <br /> rinseate will be stored on site in labeled 55 Fallon drums. Soil generated from <br /> drilling activities will be stockpiled on site. Mnseate and stockpiled soil will be <br /> removed from the site by a licensed waste hauler for disposal. <br /> F <br /> 5.4 PILOT TESTING <br /> 5.1 Groundwater Pumping Test <br /> 1 <br /> Clearwater will perforin a groundwater pumping test in the week following the <br /> installation of the extraction well. The purpose of the test will be the determination j <br /> of the physical characteristics of the shallow ater bearing zone beneath the site. <br /> Evaluation of data collected during the test will enable the calculation of hydraulic. <br /> conductivity, transmissivity, and other applicab e aquifer parameters. Note that no <br /> . separate phase hydrocarbons will be extracted dring the test. <br /> I <br /> The first portion of the test will consist of a "step-drawdown" test. This task <br /> involves the extraction of groundwater from the test well at varying rates, with the <br /> r purpose being the determination of the most appropriate extraction rate for the <br /> i longer term pumping test. It is anticipated that this endeavor will take <br /> I' approximately four hours, and should involve no more than four or five "steps". <br /> F <br /> The first step will use a groundwater extraction rate of 0.5 gallons per minute (gpm). <br /> Water will be pumped at this rate until the water level in the extraction well <br /> stabilizes, at which time the test will be taken tc the next step. It is anticipated that <br /> r, the steps will progress in half gallon intervals, though field observations may <br /> necessitate a modification to this plan. The test will continue until observations <br />-• indicate that an optimal pumping rate has been obtained. Ideally, this optimal rate <br /> should result in a sustainable yield with approximately 10-15 feet of water <br /> I <br /> D-107/PILOT TEST WP 3 <br />