Laserfiche WebLink
CLEARWATER <br /> G R O L! P. I N C. <br /> All wells will be surveyed to',the.north side of the top of casing for elevations <br /> to the.nearest '±0.01 foot. Elevations will be, referenced either .to mean. sea- <br /> level'or to a project datum. -A project datum is typically chosen for 'its <br /> location such that it will remain'unchanged in the event of site construction <br /> or other- site .disturbances. .Where requiredE, the wells will be surveyed by a <br /> : : licensed land surveyor, relative to`the neare4st benchmark. <br /> .Well Development <br /> AlI newly installed wells will be developed prior to sampling to remove fine: <br /> grained.sediments from the well and stabilize the filter pack-and the disturbed <br /> aquifer- materials. Well development consist of surging with a surge <br /> ` block and removing water-from the well ith either a.pump or bailer, until <br /> the well is'. free of sediment, or after 10 well._casing volumes have been <br /> removed. Where appropriate, temperature, pH, specific conductance and <br /> turbidity will be monitored' during well development. ,-.-All development. <br /> .. . equipment .will be cleaned rior to use an between wells with an Alconox.. <br /> P . <br /> solution, then rinsed in clean water. ' All data-collected during development <br /> FIF will be presented on the.well''development data.sheet. <br /> r <br /> Ground Water Sampling . <br /> Prior to the start of work, a 'decontamination area will be established. This <br /> will be in a secured area and.:consist of an Alconox solution wash, a first rinse <br /> and a second rkise. Any down hole equipment will be decontaminated prior <br /> to use. . <br /> -r <br /> Prior, to purging and sampling any well, the static water level will be <br /> measured with an electronic water sounder or an oil/water interface probe to <br /> the nearest ±0.01 foot. If.floating product is detected, interface probe results <br /> will be confirmed by lowering a clear disposable polyethylene bailer down the <br /> well and measuring the product thickness to the nearest ±0.01 foot, in the <br /> bailer. . Any monitoring well containing detectable- amounts of floating <br /> product- ,will not.be purged, or sampled. Field observations such as well <br /> integrity as well - as water level measurements and floating product <br /> thicknesses will be noted on the gauging data/purge calculations,form. <br /> All monitoring wells to be sampled shall be purged using either a PVC bailer <br /> or a submersible pump. : Physical parameters (pH,- temperature and <br /> conductivity) of the purge water will be monitored for stabilization during <br /> r <br /> CLEARWATER GROUP,INC. 3 April 28, 1995 <br /> k ' <br />