Laserfiche WebLink
1210 VERA <br /> CHRONOLOGY <br /> PAGE 2 <br /> 1996 <br /> 01/05/96 Closure/site certification evaluation initiated. <br /> 06/25/96 Soil boring cuttings and monitoring well purge water removed from site and <br /> discarded in accordance with all applicable regulations. <br /> 07/16/96 Closure/site certification evaluation complete. <br /> Attachments <br /> Soil <br /> Soil Borings; Table 1, Summary of Soil Sample Analytical Results <br /> Summary of soil sample results: 02/23/95 sampling date <br /> Plot plan of site <br /> Water <br /> Monitoring wells; Table 1, Summary of Groundwater and Sample Analytical Results <br /> Summary of results from groundwater monitoring events, MW1 - MW3: <br /> 02/28/95 through 12/21/95 <br /> Boring logs for MW1 - MW3 <br />