My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012646
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VON SOSTEN
>
16555
>
3500 - Local Oversight Program
>
PR0545795
>
ARCHIVED REPORTS_XR0012646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 5:43:17 PM
Creation date
6/15/2020 2:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012646
RECORD_ID
PR0545795
PE
3528
FACILITY_ID
FA0002952
FACILITY_NAME
LAMMERSVILLE SCHOOL
STREET_NUMBER
16555
STREET_NAME
VON SOSTEN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20914009
CURRENT_STATUS
02
SITE_LOCATION
16555 VON SOSTEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. W <br /> a' <br /> r <br /> Rai <br /> WORK PLAN <br /> SECONDARY ASSESSMENT <br /> AND COMPLIANCE MONITORING <br /> LAMMERSVILLE SCHOOL DISTRICT <br /> 16555 WEST VON SOSTEN ROAD <br /> TRACY,CALIFORNIA <br /> October 17, 1991 <br /> 1.0 INTRODUCTION <br /> This work plan is presented by Groundwater Technology, Inc. on behalf of Lammersville School <br /> District, to summarize proposed steps for further assessment of hydrocarbons in groundwater at the <br /> Lammersvilfe School located at 16555 West Von Sosten Road, in Tracy, California {f=igures 1 and 2, <br /> Appendix A.) This work plan was prepared in accordance with provisions of the San Joaquin County <br /> Public Health Services•Environmental Health Division ISJCEHDI,Site Mitigation Program guidelines for <br /> work plan and report submittal. <br /> 2.0 WORK PLAN OBJECTIVES AND TASKS <br /> The goal of this work plan is to determine the lateral extent of gasoline hydrocarbons in groundwater <br /> near the former underground gasoline tank location at the school, (Figure 2, Appendix A). The initial <br /> task is to gain approval of this work plan by the SJCEHD and obtain well permits for additional <br /> subsurface investigation. The second work step is to install groundwater monitoring wells; <br /> of dissolved <br /> groundwater sampling of the new and existing monitoring wells will define the extent <br /> petroleum hydrocarbons. The findings including data and observations will be described in a report. <br /> The final objective is to propose a monitoring and sampling program for the site, and execute that <br /> program for compliance with SJCEHD requirements. <br /> TECIISOLOGY,Ixc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.