Laserfiche WebLink
C <br /> Work Plan,Decommissioning Monitoring Wells MW-3,MW-4,and MW-7 <br /> 2130 West Washington Street <br /> Stockton,California <br /> Sierra-Pacific Project No.92-033.04 <br /> L <br /> W <br /> r 6.0 REMARKS AND SIGNATURES <br /> L..l <br /> Recommendations and the approach to the work outlined in this work plan represent our professional <br /> opinions. These opinions are based on currently available client information, and were developed in <br /> accordance with currently accepted hydrogeologic and -engineering practices. Other than this, no. <br /> warranty is implied or intended. <br /> 4� <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS,INC. <br /> This J. ineeZng�Geologist <br /> I <br /> anared by: <br /> John G- 133 Date <br /> Senio <br /> LSI <br /> This work plan was reviewed by: <br /> i <br /> John Killey, REA Date <br /> Senior Chemist <br /> �I <br /> 09/09/98/p1an033z.jsr/jb <br /> Sierra-Pacific Groundwater Consultants,Inc. 5 <br />