Laserfiche WebLink
4 <br /> 2. GENERAL REQUIREMENTS <br /> 2.1 SCOPE OF WORK <br /> A. Purpose— One, triple completion monitoring well will be drilled, constructed, and developed <br /> as part of the project. Minimum 8 3/,-inch diameter test hole shall be drilled site at the site which <br /> shall serve to evaluate the lithologic character of subsurface formations and aquifers at the site <br /> to determine characteristics of the aquifer materials through geophysical surveys and <br /> measurements. The monitoring wells will be used to sample ground water and measure water <br /> levels at selected depth horizons. The individual piezometers monitoring test hole depth and <br /> preliminary monitoring piezometer depths are summarized below. <br /> Borehole <br /> Well Depth Piezometer Casing Screen Interval <br /> ft Depth (ft) (ft) <br /> MW 190 195 180-190 <br /> Site 21 MW 300 MW 250 255 240-250 <br /> MW 290 295 280-290 <br /> B. Test Hole Drilling and Well Construction <br /> 1. The Work to be completed under this Contract will consist of furnishing all materials, <br /> labor, equipment, fuel, tools, transportation and services for the drilling, sampling and <br /> logging of test holes at selected sites. The test holes shall be converted to permanent <br /> monitoring wells and one extraction well. In the event that the Owner does not elect to <br /> convert a test hole to a well,the test hole shall be destroyed in the manner specified herein. <br /> 2. The project site is located in San Joaquin, County, CA. <br /> 3. The maximum anticipated test hole depth is 300 feet. The actual depth of the test hole <br /> will depend on the lithology encountered. A driller's log will be prepared to describe the <br /> lithology encountered during drilling. The contractor will collect samples of drill cuttings. <br /> The test hole shall be geophysically logged. <br /> 4. The minimum diameter of the test hole is 8 '/-inches. The contractor may drill a larger <br /> diameter test hole at his own expense. <br /> 5.The final design for the monitoring wells will be prepared by the Engineer after evaluating <br /> the test hole data. <br /> 6. Cuttings, drilling fluids, and development water shall be completely contained. <br /> Contractor shall take care and employ all reasonable measures to prevent fluids from <br /> leaving work area and/or entering storm water systems. The Contractor shall take full <br /> ownership of drill cuttings generated from drilling operations and be responsible for <br /> handling and proper offsite disposal. Transportation and disposal costs shall be the <br /> responsibility of the Contractor. <br />