Laserfiche WebLink
6 <br /> 4. In accordance with these Technical Provisions,the Contractor shall submit a drilling fluid <br /> program for approval prior to construction. The submittal shall include the <br /> recommendations for make-up water conditioning, quantities of clay base, and additives <br /> required to maintain a drilling fluid having properties within the ranges specified below for <br /> test hole drilling and reaming operations. <br /> The drilling fluid shall be maintained in such a manner as not to exceed the properties <br /> specified above for weight, viscosity, and sand content without the approval of the <br /> Engineer. In addition, the Contractor shall maintain the minimum viscosity of the drilling <br /> fluid that will raise cuttings and adequately condition the walls of the holes. At the <br /> completion of all drilling operations, the drilling fluid shall be conditioned and meet the <br /> following property ranges for well construction. <br /> Direct Circulation <br /> Property Drilling Method <br /> a) Weight: 8.7—9.3 lbs./gal <br /> b) Marsh Funnel Viscosity: 28—35 sec/qt <br /> c) API Filter Cake Thickness: <3/32 <br /> d) Sand Content of Returns: < 1/2% by volume <br /> 5. The drilling rig must be provided with equipment to measure the drilling fluid weight, <br /> viscosity, API filter cake, and sand content. <br /> 6. The Contractor shall maintain a current log describing the condition of the drilling fluid <br /> on the site. The log shall include the following: <br /> a)time, depth and results of all drilling fluid tests; <br /> b) materials added to the system; type, quantity, time, and depth; <br /> c)variances or modifications from approved drilling fluid program(e.g.,time,depth, <br /> reason, and authorization). <br /> 7. Proper control of the drilling fluid must be maintained to the satisfaction of the <br /> Engineer. The Contractor will be required, at the Contractor's expense,to retain or employ <br /> an experienced, qualified drilling fluid, or mud, engineer to supervise and maintain drilling <br /> fluid characteristics to the satisfaction of the Engineer if such control cannot be <br /> accomplished by the Contractor. <br /> 8. If at any time the drilling fluid is not in compliance with these Technical Provisions or the <br /> recommendations of the drilling fluid engineer,as approved by the Engineer,the properties <br /> shall be adjusted and the tests rerun until the drilling fluid obtains the specified <br /> characteristics. If the specified properties cannot be maintained, the drilling fluid shall be <br /> replaced. <br />