My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040745
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
18401
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 11:26:01 AM
Creation date
6/16/2020 9:37:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040745
PE
4349
STREET_NUMBER
18401
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
LATHROP
Zip
95337-
APN
24140026
ENTERED_DATE
4/21/2020 12:00:00 AM
SITE_LOCATION
18401 MCKINLEY AVE
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 MATERIALS <br /> 2.2.1 CERTIFICATES OF COMPLIANCE <br /> If requested by the Engineer, the Contractor shall provide certificates of compliance as specified <br /> herein. <br /> A. Items Requiring a Certificate of Compliance <br /> 1. The Contractor shall submit to the Engineer for approval, certificates of compliance for <br /> the following materials: <br /> b) Cement Grout Sealing Material <br /> c) Blank Well Casing <br /> d)Well Screen <br /> e) Gravel Envelope Material <br /> 2. No material shall be incorporated into the Work until certificates of compliance have <br /> been approved in writing by the Engineer. <br /> B. Content of Certificates of Compliance <br /> 1. Certificates of compliance from the Contractor, suppliers, and/or manufacturers, shall <br /> clearly indicate that the material to be delivered to the job site will meet all requirements of <br /> the project Technical Provisions. A certificate of compliance shall include, but not be <br /> limited to the project title, delivery location, date(or approximate date)of delivery, name of <br /> the material with appropriate classification or model numbers, quantity, name of the <br /> manufacturers, statement of compliance with all requirements of the Technical Provisions, <br /> and the name, title and signature of the certifying agent. <br /> 2. A factory or mill certification (laboratory test report) shall be submitted with the <br /> certificates of compliance for all components of the casing assembly. The factory or mill <br /> certification shall not be a substitute for the certificate of compliance, unless it contains all <br /> information required for a certificate of compliance as described above. Insufficient, <br /> incomplete, or unclear certificates will be rejected, and the Contractor shall be responsible <br /> for all delays caused by any need for re-submittal. <br /> C. New Materials--All materials provided by the Contractor shall be new. <br /> 2.2.2 MATERIALS SPECIFICATIONS <br /> A. Sealing Material -- Sealing material, consisting of sand-cement grout shall be employed for <br /> abandonment purposes and surface seals in the wells. Bentonite chips as well as sand/cement <br /> grout may be employed in the wells for intermediate seals and to limit infiltration of cement grout <br /> into the gravel envelope. <br /> 1. The sealing material shall be composed of a slurry of sand-cement grout. The grout <br />
The URL can be used to link to this page
Your browser does not support the video tag.