Laserfiche WebLink
18 <br /> 3.1.12 ITEM NO. 12: SITE CLEAN-UP AND RESTORATION <br /> A. Measurement and Payment:—The site clean-up and restoration satisfactorily completed will <br /> be paid for at the lump sum price stated in the proposal. Such payment will be considered full <br /> compensation for furnishing all labor, material, tools and equipment necessary and incidental to <br /> restore the site to its original condition. <br /> 3.1.13 ITEM NO. 13: BOREHOLE ABANDONMENT <br /> A. Measurement:—Abandonment will be measured as the number of lineal feet of borehole <br /> required to be destroyed and shall not exceed the number of feet of test hole successfully drilled <br /> and approved for payment under Section 2.3.10. <br /> B. Payment: —Payment for borehole abandonment will be made on a linear foot basis at the <br /> unit price stated in the proposal. Such payment will be considered full compensation for <br /> furnishing all labor, material, tools and equipment necessary and incidental to destroy the test <br /> hole. <br />