Laserfiche WebLink
17 <br /> B. Payment: --The quantities of well casing and well screen, satisfactorily installed, will be paid <br /> for at the applicable unit prices stated in the proposal for each item. Such payment will be <br /> considered full compensation for furnishing all labor, material, tools and equipment necessary <br /> and incidental to installation. <br /> 3.1.7 ITEM NO. 7: GRAVEL ENVELOPE AND INTERMEDIATE SEALS <br /> A. Measurement:—Gravel envelope and intermediate seals will be measured in place to the <br /> nearest whole unit of lineal feet of annular space satisfactorily filled in the final well. <br /> B. Payment: --The quantities of gravel envelope and intermediate seals satisfactorily installed, <br /> will be paid for at the applicable unit prices stated in the proposal for each item. Such payment <br /> will be considered full compensation for furnishing all labor, material, tools and equipment <br /> necessary and incidental to installation. <br /> 3.1.8 ITEM NO.8.ANNULAR SEAL <br /> A. Measurement:—Annular seals will be measured in place to the nearest whole unit of lineal <br /> feet of annular space satisfactorily filled in the final well. <br /> B. Payment: --The quantity of annular seal, satisfactorily installed, will be paid for at the <br /> applicable unit prices stated in the proposal for each item. Such payment will be considered full <br /> compensation for furnishing all labor, material, tools and equipment necessary and incidental to <br /> installation. <br /> 3.1.9 ITEM NO. 9: WELL DEVELOPMENT <br /> A. Measurement and Payment: --The development of the well, satisfactorily completed, will be <br /> paid for at the lump sum price stated in the proposal. Such payment will be considered full <br /> compensation for furnishing all labor, material, tools and equipment necessary and incidental to <br /> developing the piezometers. <br /> 3.1.10 ITEM NO. 10: WELL SURFACE COMPLETION <br /> A. Measurement and Payment: --Well surface completion, satisfactorily installed,will be paid <br /> for at the lump sum price stated in the proposal. Such payment will be considered full <br /> compensation for furnishing all labor, material, tools and equipment necessary and incidental to <br /> installation of the security completion. <br /> 3.1.11 ITEM NO. 11: STANDBY TIME <br /> A. Measurement: —Standby time, ordered by the Engineer, will be measured to the nearest <br /> one-quarter unit as the number of hours of idle time for drilling equipment and crew. <br /> B. Payment: --Standby time, ordered and approved by the Engineer, will be paid for at the unit <br /> price specified in the proposal. <br />