Laserfiche WebLink
z <br /> 1.1.5 SERVICES FURNISHED BY THE OWNER <br /> 1. The Owner has obtained the necessary legal right-of-way for the drilling and well construction <br /> work. <br /> 1.1.6 REFERENCE POINTS <br /> The Owner will stake the location of the test holes. <br /> 1.1.7 WORK AREA RESTRICTIONS <br /> A. General -- The Contractor shall protect all existing facilities and shall keep the site clear and <br /> open all the time. The Contractor may use,without cost,open areas on the project site as approved <br /> by the Engineer, for the Work. <br /> B. Coordination With Other Activities--Contractor is advised that other work by the Owner may <br /> be conducted at the project site. The Contractor shall limit all activities to the designated work <br /> areas. <br /> C. Work Hours — Operations will be limited to weekdays only. No work shall be undertaken on <br /> Saturdays, Sundays or legal holidays. <br /> D. Noise --Contractor shall adhere to any applicable noise level restrictions for each project site. <br /> E. Health and Safety--Contractor shall provide and adhere to a health and safety plan to address <br /> actual or potential hazards associated with the Work. A copy of the Contractor's health and safety <br /> form shall be posted at the job site. <br /> F. Hazardous Materials -- The Contractor shall comply with all government laws, rules and <br /> regulations concerning the use of hazardous materials and the disposal of hazardous wastes at <br /> the job site, including but not limited to the following: <br /> 1. The Contractor shall not bring hazardous materials onto the job site or deliver hazardous <br /> materials without providing the Engineer, in advance, Material Safety Data Sheets for each <br /> hazardous material. <br /> 2.All hazardous material shall be stored and used in a safe manner and shall not be stored <br /> or used in any vehicular or pedestrian traffic lanes. <br /> 3. Any hazardous products, waste or empty containers used or generated shall not be <br /> poured down any drain or sewer nor disposed of in any trash container or dumpster. <br /> 4.The Contractor will be considered the hazardous waste generator and will be responsible <br /> for the legal transport and disposal of all hazardous waste. No containers or trash will be <br /> left in any building or on any job site. <br /> 5. Violation of any of the above methods shall be sufficient cause for the Owner to stop all <br /> work. Any expense incurred by the Owner caused by the work stoppage will be borne by <br /> the Contractor. These expenses will include all costs to return the job site and all other <br /> areas contaminated by the Contractor to a hazard-free condition. <br />