Laserfiche WebLink
O: Corrosion Control <br /> Matcor Anodes <br /> 5. Position the bottom weight over the bore hole. <br /> 6. Lower the system into the bore hole while maintaining tension on the lowering rope. <br /> 7. When the bottom weight reaches the bottom of the bore hole, pull the support rope and lift the weight slightly off <br /> the bottom. Tie off the weight before pumping the coke backfill. Any excess vent pipe may be cut off with a plastic <br /> tube cutter. <br /> 8. Read the system instructions for installing the coke backfill (Page 2, Paragraph D). <br /> 9. Mix the coke breeze into a slurry with water. Pump the slurry into a separate, 1" - 2" PVC stinger pipe. <br /> 10. Pump the coke breeze slurry to a level at least 5' - 10' above the top of the continuous anode. <br /> 11. Pump the coke backfill in one, continuous step. Do not interrupt pumping until the pumping operation is <br /> completed. <br /> 12. If the coke backfill is pumped through the system vent pipe,flush the vent pipe with clear water after all the backfill <br /> is pumped into the hole. Allow the coke backfill to settle for a minimum of 12 hours before applying the slurry. <br /> 13. Do not pour dry concrete backfill into the hole. It must be pumped as a slurry. <br /> 14. Once the coke backfill is pumped,the system is ready for the electrical hookup. <br /> 15. Install an appropriate valve frame and cover. (See Numbered Document K-40 for non-traffic areas, K-41 or K-41.1 <br /> for traffic areas, or K-44 for incidental traffic areas.) <br /> 16. Every person who digs, bores, or drills a cathodic protection well, abandons or destroys such a well, or deepens or <br /> re-perforates such a well, must file a report of completion of that well with the appropriate agency of the state of <br /> California within 30 days from the date its construction, alteration, abandonment, or destruction. Use the report <br /> forms furnished by that agency. Ensure the report contains the following information: <br /> A. A description of the well site that is sufficiently exact to allow locating and identifying the well. <br /> B. A detailed log of the well drilling. <br /> C. A description of the type of construction. <br /> D. The perforation details. <br /> E. The method(s) used to seal off surface or contaminated waters. <br /> F. The method(s) used to prevent the contaminated waters of one aquifer from mixing with the waters of another <br /> aquifer. <br /> G. The signature of the well driller. <br /> Trr <br /> 34" Diameter �i r=�� Optional Extra <br /> Y//,iQ\\ Weight <br /> \I11 <br /> 1 <br /> Shipping Skid <br /> Approximate Weight: 305 Pounds Without Backfill <br /> Side View Front View <br /> Figure 1 <br /> Shipping Container <br /> 0-13.5 Page 2 of 4 Rev. #04: 10-09-08 <br />