My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040806
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSWOOD
>
225
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 9:48:13 AM
Creation date
6/16/2020 9:39:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040806
PE
4373
STREET_NUMBER
225
STREET_NAME
MOSSWOOD
STREET_TYPE
AVE
City
STOCKTON
Zip
95206-
APN
16530405
ENTERED_DATE
5/11/2020 12:00:00 AM
SITE_LOCATION
225 MOSSWOOD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O: Corrosion Control <br /> Matcor Anodes <br /> 5. Position the bottom weight over the bore hole. <br /> 6. Lower the system into the bore hole while maintaining tension on the lowering rope. <br /> 7. When the bottom weight reaches the bottom of the bore hole, pull the support rope and lift the weight slightly off <br /> the bottom. Tie off the weight before pumping the coke backfill. Any excess vent pipe may be cut off with a plastic <br /> tube cutter. <br /> 8. Read the system instructions for installing the coke backfill (Page 2, Paragraph D). <br /> 9. Mix the coke breeze into a slurry with water. Pump the slurry into a separate, 1" - 2" PVC stinger pipe. <br /> 10. Pump the coke breeze slurry to a level at least 5' - 10' above the top of the continuous anode. <br /> 11. Pump the coke backfill in one, continuous step. Do not interrupt pumping until the pumping operation is <br /> completed. <br /> 12. If the coke backfill is pumped through the system vent pipe,flush the vent pipe with clear water after all the backfill <br /> is pumped into the hole. Allow the coke backfill to settle for a minimum of 12 hours before applying the slurry. <br /> 13. Do not pour dry concrete backfill into the hole. It must be pumped as a slurry. <br /> 14. Once the coke backfill is pumped,the system is ready for the electrical hookup. <br /> 15. Install an appropriate valve frame and cover. (See Numbered Document K-40 for non-traffic areas, K-41 or K-41.1 <br /> for traffic areas, or K-44 for incidental traffic areas.) <br /> 16. Every person who digs, bores, or drills a cathodic protection well, abandons or destroys such a well, or deepens or <br /> re-perforates such a well, must file a report of completion of that well with the appropriate agency of the state of <br /> California within 30 days from the date its construction, alteration, abandonment, or destruction. Use the report <br /> forms furnished by that agency. Ensure the report contains the following information: <br /> A. A description of the well site that is sufficiently exact to allow locating and identifying the well. <br /> B. A detailed log of the well drilling. <br /> C. A description of the type of construction. <br /> D. The perforation details. <br /> E. The method(s) used to seal off surface or contaminated waters. <br /> F. The method(s) used to prevent the contaminated waters of one aquifer from mixing with the waters of another <br /> aquifer. <br /> G. The signature of the well driller. <br /> Trr <br /> 34" Diameter �i r=�� Optional Extra <br /> Y//,iQ\\ Weight <br /> \I11 <br /> 1 <br /> Shipping Skid <br /> Approximate Weight: 305 Pounds Without Backfill <br /> Side View Front View <br /> Figure 1 <br /> Shipping Container <br /> 0-13.5 Page 2 of 4 Rev. #04: 10-09-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.