Laserfiche WebLink
Item No. <br /> PC: 10-4-90 <br /> SU-87-24 (TE-91-1) <br /> Page 10 <br /> The pit percolation test can be performed in the first <br /> sand strata within 25 feet of the ground surface. <br /> C. The percolation tests are to be conducted and the above <br /> conditions are to be met prior to the recordation of the <br /> Final Map. <br /> 3 . PACIFIC GAS AND ELECTRIC COMPANY: <br /> Conditions of Approval: <br /> a. The 25-foot-wide access road shall be dedicated as a <br /> public utility easement. <br /> b. Ten-foot-wide public utility easements shall be dedicated <br /> on all street frontages and shall be shown on the Final <br /> Map. <br /> 4 . PLANNING DIVISION: <br /> Conditions of Approval: <br /> a. All dwellings shall be constructed on the high ground of <br /> each parcel or have finished floor elevations 18 inches <br /> above the natural ground elevation. <br /> Ordinance Requirements: <br /> The Ordinance Requirements listed below have been identified <br /> as pertinent to this project. Other Ordinance Requirements <br /> may also apply. Ordinance Requirements are not appealable. <br /> b. All Conditions which applied to approval of the tentative <br /> map continue to apply with the Time Extension. The <br /> extension of the expiration date is for a period of three <br /> years. The new expiration date is September 1, 1993 . <br /> 5. BUILDING INSPECTION DIVISION: <br /> Ordinance Requirements: <br /> The Ordinance Requirements listed below have been identified <br /> as pertinent to this project. Other Ordinance Requirements <br /> may also apply. Ordinance Requirements are not appealable. <br /> a. A grading plan shall be submitted by the applicant, and <br /> it shall be approved and a grading permit issued by the <br />