My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:07:46 PM
Creation date
6/17/2020 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t26 October 2000 <br /> AGE-NC Project No. 98-0466 <br /> ' Page 5 of 10 <br /> 2.1.1. Soil Sample Collection <br /> Discrete soil samples were collected from the probe borings at 5-foot in ervals,beginning at 5 feet <br /> bsg, to total depth of each boring. Soil samples were collected using i Geoprobe soil sampling <br /> assembly loaded with four pre-cleaned 1.125-inch by 6-inch brass sl eves. Soil samples were <br /> preserved by covering both ends of the brass sleeve with Teflon sheets, capping, and sealing with <br /> tape.Each sample sleeve was labeled with soil probe boring location,depth,time,date and sampler's <br /> initials. <br /> ' Soil samples from hand auger borings DSI through DS4 were colle ted utilizing a 2.25-inch <br /> diameter metric soil sampler loaded with one 2-inch by 6-inch brass slee�e. The sampling assembly <br /> was advanced using a slide hammer. Soil samples were preserved by covering both ends of the brass <br /> sleeve with Teflon sheets,capping,and sealing with tape.Each sample sleeve was labeled with soil <br /> probe boring location, depth, time, date and sampler's initials. <br /> ' Each preserved sample was logged on a chain-of-custody form, placedin a chilled container and <br /> transported to Precision Enviro-Tech Analytical Laboratory(PET)a California Department ofHealth <br /> Services (DHS)-certified laboratory under chain of custody; selected samples were analyzed for: <br /> ' • Total recoverable petroleum hydrocarbons(TRPH)in accordance with EPA Method 418.1; <br /> ' • Total petroleum hydrocarbons quantified as diesel(TPH-d)and tot 1 petroleum hydrocarbons <br /> quantified as motor oil (TPH-mo) EPA Method 8015 Modified; <br /> ' • Volatile organic compounds (VOCs) in accordance with EPA Method 8260B; <br /> • Semivolatile organic compounds (SVOCs)PCP and TCP in accordance with EPA Method <br /> 8270; <br /> • Chromium, lead, zinc in accordance with EPA Method 6010; and <br /> • Formaldehyde in accordance with EPA Method 8315. <br /> ' 2.1.2 . Ground Water Sample Collection <br /> One grab ground water sample was collected from LP4 using a tempo ary 1-inch diameter PVC <br /> screen.The probe rods were advanced to total depth,the hollow steel rod were then pulled out,and <br /> the screened casing was inserted into the saturated zone. Ground watei was allowed to enter the <br /> casing, and samples were retrieved using a modified PVC tubing bail er. Sufficient sample was <br /> collected from boring LP4 to fill four 40-m1 EPA-approved VOA via s containing 0.5 ml 18% <br /> hydrochloric acid as a sample preservative and into one 1-liter and one 500-ml amber bottles without <br /> sample preservative. Ground water sample containers were labeled with probe boring designation, <br /> Advanced GmEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.