My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRILLING AND WLING • <br /> For all drilling and sampling activities, the following standard <br /> safety procedures shall be employed: <br /> 1. All drilling and sampling equipment should be cleaned before <br /> proceeding to the drill site. <br /> 2. At the drill or sampling site, sampling equipment should be <br /> cleaned after each use. <br /> 3. Work in 'cleaner" areas should be conducted first where <br /> practical. <br /> 4. The minimum number of personnel necessary to achieve the objec- <br /> tives shall be within 25 feet of the drilling or sampling <br /> activity. <br /> l <br /> 5. If emergency and backup subcontracted personnel are at the <br /> site, they should remain 25 feet from the drilling or sampling <br /> activity, where practical. <br /> 6. Exclusion sones will be established within designated hot <br /> lines. Delineation of a hot line will reflect the interface <br /> between areas at and below a predetermined threshold con- <br /> taminant concentration, based on available data including the <br /> results of monitoring and chemical analyses, information from <br /> site personnel regarding historical site activities, and <br /> general observations. This determination will be made by the <br /> PM in conjunction with the S50 and site personnel. <br /> 7. All unauthorized personnel will remain outside exclusive zones <br /> at all times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.