My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. .H. KLEINFELDER & ASSOCIATES <br /> 2 BACKGROUND <br /> on February 17 and 18, 1987, Dames and Moore performed a site screening <br /> and a Phase I reconnaissance of the moulding and milling facility (AM&M) <br /> located on West Lane Road in Stockton, California. The site location is <br /> shown on Plate 1. They recommended a Phase II investigation of certain <br /> "areas of interest" as follow—up and verif cation at previous <br /> investigative work. <br /> Other prior work at this site has been performed by Bechtel National, <br /> Inc. , and Kleinfelder. Bechtel, in reports during 19B4 and 1985, reviewed <br /> the handling of hazardous materials and the handling and disposal <br /> practices of hazardous wastes at the site. Kleinfel er is in the process <br /> of investigating potential contamination from an underground diesel tank <br /> and pentachlorophenol (PCP) dipping operation. <br /> The Dames and Moore report, based on their Phase I reconnaissance, <br /> identifies 11 areas of possible contamination requiring further <br /> investigation (Attachment 1) . Since then an additional underground tank <br /> has been located near the septic tank. This tank was previously used to <br /> store boiler fuel. <br /> AM&M has an underground tank removal program. Two tanks which were <br /> Jplanned by Dames and Moore to be a part of the Phase II investigation are <br /> scheduled for removal. Investigation of possible soil contamination in <br /> the area of these tanks will be deferred until then. The tanks are the <br /> 10,000—gallon former diesel fuel tank located south of the -Primer <br /> 1 Building, and the 500—gallon waste oil and spent solvent tank located east <br /> of the maintenance shop. Investigation in the a ea of the newly found <br /> ` boiler fuel tank will also be deferred until removal. <br /> 46-87-282 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.