Laserfiche WebLink
TABLE 1 <br /> • 0 <br /> MILE, SUBBURFACE SOURCES <br /> Present Tank and Lines Passed/ AFP Planned Schedule for D t R Proposed <br /> 16FP) Contents Tested 7 (1) Failed Action AFP Action Investigation <br /> (reported by AFP) (1) (reported by AM <br /> ekpty and ynfailed �excavate tonK� pending DONS none <br /> sealed and contatinated i opprovLi1 of sail (Y) workplan <br /> j diesel yes passed leave in service and NA none n <br /> monitor by inventory <br /> reconciliation <br /> primer equipment no remove and replace pend ng AFP manage- sail boring C <br /> wash-down water with above ground cent approval but and samples <br /> containment pri0 to Aug. 1988 <br /> l gasoline yes passed leave in service and NA none <br /> monitor by inventory <br /> 1 reconciliation <br /> { not umtd NA NA leave in service as NA sediment sasple <br /> stars wattr catch fron first sump. <br /> basins Lind drain (3) <br /> tepty and Yes passed reaave and replace pending AFP manage- surface sample% <br /> sealed with above ground tent approval but <br /> containsent prior to Aug. 1989 <br /> diesel yes patted monitored wteKly pending AFP manage- none - C <br /> until removed and teni approval but <br /> replaced with above prior to Aug. 1988 <br /> ground containment <br /> i empty no T close in place no schedule soil boring <br /> if sail boring and samples <br /> shows clean (d) <br /> is recycled steam no 7 none Iea,t in none <br /> water from operation <br /> boiler <br /> empty NA NA none AFP unaware of -sediment sample <br /> y sum pretence from inside sump <br /> 1 <br /> sewage NA NA pulp alt wil investigate soil baring <br /> accasionaly pas ible adjacent and sosples <br /> I <br /> tan 's presence <br /> n supplied by AFP. <br /> {reiiminary Remedial Action Plan, 19Bb, <br /> 'ond analyzed for priority pollutants (8echtel, 1980, Results have not been inspec ed. <br /> and tank, AFP believes it to be connected to septic system, AFP will uncover and avestigate, <br />