My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> IDENTIFIED POSSIBLE SURFACE SOURCES <br /> Identified location Potsible Post Practices Present Practices AFP Planned Action Schedule <br /> �f materials (reported by AFP) (reported by AFP) lreportsd by AFP) AFP Acti <br /> lreporte <br /> ;rth of Yankee Stadiumlead, waste oil storage of batteriese batteries reeovedr none (1) Nh - <br /> Shook Storage Building oil spill open ground <br /> tuthwest of Pigeon Alley pinta solution unknown tank has been excavate contain- pending 1 <br /> ook Storage Building and petroleuo removed inated soil (2) approval <br /> Ito solution dip tank distillates action p] <br /> uth of Priming fuel oil and wash-down water woth-down water none (?) HA <br /> wilding priming equipment disposed onto grounds disposed into <br /> wash-down water fuel oil spillage? subsurface taAK <br /> ost of Ray Bond glue wash-down dispose of wash-dam dispose of waeh-down install closed some time <br /> ilding water water onto ground water onto ground collection system December <br /> behind building behind building (sink 1 drum) <br /> $arth of Millwork glue wash-down dispose of wath- woth-down water it none NA <br /> iildinq water, dam voter onto collected into <br /> ground (Hog cloied collectlon <br /> Alley) system (sink I drum) <br /> att of Saw Filing Room caustic wash drain into storm drain, drain into storm drain, hant NA <br /> water and metals ultimate discharge ultimate discharge <br /> into north storm pond into north storm pond <br /> dorm Ponds (central and 7 collect plant runoff, collect& plant none NA <br /> firth pond) occasionally used stars runoff <br /> as burn pit for <br /> wood waste (dry pond) <br /> �rth Storm Pond petroleum product occidmntial spill collects plant none (4) NA <br /> or off-plant source ..store runoff <br /> of petroleum product <br /> i <br /> etrical transformtrt PCB's in use use in use and rest notify appropriate NA <br /> stared on paved ground regulatory agency <br /> south of 250,000 gel, if a leak or spill <br /> , <br /> fire pond <br /> a <br /> ril tasp)ts were collected and analyzed for mato];, Results indicate low levels (Bechtel) 1984), <br /> moval of contominoted toil is proposed in a J.H. Kleinfelder.t Assoc, Preliminary Amdial Action Plan, <br /> }me area idmtlfied in Table 1, Possible Eubwrface Sources <br /> itaninated soil reportedly excavated after pond allowed to dry, <br /> 1mPles of transformer oil wrry found to contain PCB's within range of 120-180 ppa, resulting in minimal regulatory requirements <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.