My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Jtc.�Uu. N01tn8uc t.nt if. <br /> Dame*& Moore 155 N.E. l00rhStrect <br /> P.O.Boz 75981 <br /> Seattle,WA 98125-0981 <br /> �- (206)527-0560 <br /> April 20,, 1987 <br /> American Forest Products Company <br /> Remanufacturing Division <br /> P.O. Box 8368 <br /> Stockton, CA 95208 <br /> Attention: Mr. Bernie Sloop <br /> Dear Mr. Sloop: <br /> Dames 8 Moore will be conducting a brief soil sampling program <br /> ' at your facility from May 5 to 7 , 1987 . I plan to be at your <br /> facility on Monday afternoon, May 4 and will be able to discuss our <br /> sampling plan in detail at that time. This letter briefly summarizes <br /> our sampling plan. <br /> SOIL BORINGS . <br /> Three sampling areas will require access by a small , <br /> truck-mounted drilling rig. I have scheduled the rig to arrive on <br /> site Tuesday, May 5. These three sampling areas are described below: <br /> o South of the Primer Building adjacent to t e 10,000 gallon <br /> primer wash down tank <br /> o South of the Ray Bond Building adjacent to the previous penta <br /> dipping tank <br /> o Northeast of the Finger Joint Building in the area of the <br /> septic tank <br /> The drilling rig is approximately 8 feet wide by 20 feet long. <br /> The mast height , when raised , is approximately 25 feet . Soil <br /> cuttings from the borings will be collected and stored in 55-gallon <br /> drums. The borings will be backfilled with cement grout upon <br /> completion of sampling. <br /> The drillers will need an area ( that will not conflict with your <br /> y operations) where they can steam clean their equipment between <br /> borings. The drillers will have a steam cleaner but will require <br /> water and electricity access. I anticipate completing the drilling <br /> activities by Wednesday , May 6 . <br /> APR. 2 2 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.