My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Y <br /> M' 10ames & Moore <br /> BACKHOE PITS <br /> I have arranged for a backhoe and operator to be on site <br /> Thursday , May 7 for collection of surface soil samples. The backhoe <br /> pits will be excavated to a depth of 3 feet at locations described <br /> below : <br /> o Adjacent to waste oil tank east of Maintenance Building <br /> o Open ground south of Priming Building <br /> o Open ground east of Ray Bond Building <br /> o Open ground north of Millwork Building <br /> o Drainage ditch west of Saw Filing Room <br /> Opened pits will be backfilled with removed material . <br /> WATER AND SEDIMENT SAMPLES <br /> I will be collecting surface water and drain sump sediment <br /> samples from a few outside locations at your facility and do not <br /> anticipate disturbance to your operations. <br /> I will also need to collect a water sample from the water supply <br /> well located on the eastern portion of your facility . I have been <br /> informed that this well is operational although not currently used . <br /> a Water sampling requires the well to be turned on and allowed to <br /> A produce water for approximately 20 minutes until sample collection is <br /> completed . <br /> I hope this letter has clarified our planned scope of work at <br /> your facility . I will be able to finalize sample location logistics <br /> with you when I arrive on Monday, May 4 and anticipate the completion <br /> of our sampling program by Thursday , May 7 . Our goal is to collect <br /> the planned samples with a minimum of interference to your <br /> operations. I would appreciate questions or comments that you may <br /> have concerning our planned activities . <br /> i <br /> Sincerely , <br /> DAMES & MOORE <br /> e <br /> A Professional Limited Partnership <br /> Rory L . Galloway <br /> Project Engineering Geologist <br /> 1 <br /> y cc: Jeff Lammers <br /> Rick Kienle <br />
The URL can be used to link to this page
Your browser does not support the video tag.