My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAS, Y 4 2007 <br /> Department of Toxic Substa il`I tfb H <br /> r� <br /> Maureen F. Gorsen, Director <br /> Linda S.Adams 1515 Tollhouse Road Arnold Sc egger <br /> Secretary for Governor <br /> Environmental Protection Clovis, California 93611 <br /> March 12, 2007 <br /> Mr. Trevor Smith <br /> Mill Creek Land Company <br /> 1313 West Robinhood Drive, Suite A-9 <br /> Stockton, California 95207 <br /> SUMMARY OF MEETING NOTES WITH DEPARTMENT OF TOXIC SUBSTANCES <br /> CONTROL, SACRAMENTO, JANUARY 24, 2007 AT 10:30 A.M. DATED <br /> FEBRUARY 23, 2007, FORMER AMERICAN MOULDING AND MILLWORK SITE, <br /> 2801 WEST LANE, STOCKTON, CALIFORNIA <br /> Dear Mr. Smith: <br /> The Department of Toxic Substances Control (DTSC) has reviewed the subject notes <br /> which are being accepted as a workplan addendum, prepared by Geomatrix <br /> Consultants, Inc. (Geomatrix). The January 24, 2007 meeting was conducted to <br /> discuss the additional investigation and data needed in response to DTSC's <br /> December 14, 2006 letter presenting comments on the Report of Investigations, dated <br /> October 12, 2006, prepared by MACTEC Engineering and Consulting, Inc. During the <br /> meeting, the additional scope of work and data requirements wer discussed. <br /> DTSC staff from the Fresno Responsible Party Unit have reviewed the meeting notes <br /> which summarize proposed additional work at the Site. Please note the following <br /> clarifications with respect to the groundwater sampling: <br /> • The meeting notes indicate groundwater samples will be c Ilected at <br /> approximately 50 feet below surface grade. It is recomme ded that depth to <br /> groundwater be checked in the on-site monitoring wells prior to collecting the <br /> groundwater samples. Discrete samples should be collected from the <br /> first-encountered groundwater or close as the sampling technology allows. <br /> • One groundwater sample location is depicted in the south rn area of the northern <br /> portion of the Site. DTSC recommended that the groundwater sample be <br /> collected at the 40X120 building wash-down area. The sarnple represented in <br /> Figure 1 of the meeting notes should be accurately locatec in the wash-down <br /> area during sampling activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.