My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> Mr. Trevor Smith <br /> March 12, 2007 <br /> Page 2 <br /> • The meeting notes state that groundwater samples will be analyzed "as <br /> described above;" however, no earlier description was not d. DTSC concurs <br /> with the proposed ten groundwater sampling locations, wi h the exception noted <br /> in the previous item, and the proposed sample analyses. <br /> At this time, the subject workplan addendum can be considered approved by DTSC. <br /> DTSC understands that the sampling activities will be in general accordance with the <br /> April 21, 2005 Supplemental Site Assessment and Comprehensive Risk Assessment <br /> Work Plan which was approved with DTSC comments. Additionally, when future <br /> reports are submitted, an electronic copy of the report must be p ovided to DTSC. If <br /> you If you should have any questions regarding this letter or the project, please contact <br /> Mr. Thomas Berg, Engineering Geologist of the Fresno Responsible Party Unit, <br /> Northern California - Central Cleanup Operations Branch at (5591297-3978. <br /> Sincerely, <br /> Thomas W. Kovac, P.E., Chief <br /> Fresno Responsible Party Unit <br /> Northern California - Central <br /> Cleanup Operations Branch <br /> cc: Mr. Timothy Souther, REA 11 <br /> Geomatrix Consultants, Inc. <br /> 1281 East Alluvial Avenue, Suite 101 <br /> Fresno, California 93720 <br /> Ms. Roya Bozorgnia <br /> Geomatrix Consultants, Inc. <br /> 1281 East Alluvial Avenue, Suite 101 <br /> Fresno, California 93720 <br /> Mr. Frank Girardi <br /> San Joaquin County Environmental Health Department <br /> LOP/Site Mitigation Unit <br /> 304 East Webber Avenue, Third Floor <br /> Stockton, California 95202-2708 <br />
The URL can be used to link to this page
Your browser does not support the video tag.